My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:55:38 PM
Creation date
12/14/2016 3:10:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Allen Gaarder <br />From: <br />Jacob Klosinski <jklosins@southbendin.gov> <br />Sent: <br />Tuesday, May 31, 2016 2:57 PM <br />To: <br />Pat Johnston <br />Cc <br />Allen Gaarder, Huston, John <br />Subject: <br />114-053 WWTP Secondary Treatment Improvements (3" City Water Relocation) <br />Attachments: <br />3-inch City Water Relocation 2016.05.31.pdf <br />Pat: <br />Please see the attached sketch regarding the 3" City Water Service Line. I am proposing the following route <br />for the water line relocation (see sketch). Much of the piping can be run through the building with the exception <br />of the Tee in the basement (see sketch) and the underground piping located north of Gallery #3 and the <br />proposed Aeration Effluent Channel extension. Please provide pricing for the subject work. Note that multiple <br />bends may be needed in the Gallery #3 Basement to accommodate routing of the pipe to the north basement <br />wall. <br />When the tie-in work is scheduled, we will need to notify Operations and Maintenance to shut off necessary <br />valves in the tunnel to facilitate the tie-in work. <br />The existing City Water line needs to remain in service until the tie-in work begins. The City Water line <br />supplies water to the Disinfection Building laboratory sink and safety eye wash. It is my understanding that <br />excavation of the pipe may have caused this pipe to be gouged or perforated during excavation. Please <br />maintain the integrity of the pipe and support it during excavation activities. If supported, excavation and slab <br />work can continue prior to removal. <br />Regards, <br />Jacob <br />yvuTy 6 <br />Jacob M. Klosinski, P.E. <br />oA <br />�ry <br />Assistant City Engineer <br />2 <br />Environmental Services <br />LJ <br />O <br />(574)235-9496 <br />w <br />reeve ;7 <br />ikiosinsna southbendin. ov <br />City of South Bend <br />3113 Riverside Drive <br />1865 <br />South Bend, IN 46628 <br />http://www.southbendin.gov <br />IMPORTANT NOTICE! This E-Mail transmission and any accompanying attachments may contain <br />confidential information intended only for the use of the individual or entity named above. Any dissemination, <br />distribution, copying or action taken in reliance on the contents of this E-Mail by anyone other than the intended <br />recipient is strictly prohibited and is not intended to, in anyway, waive privilege or confidentiality. If you have <br />received this E-Mail in error please immediately delete it and notify sender at the above E-Mail address. Please <br />note that incoming a -mails are not routinely screened for response deadlines, and as such, please notify the <br />sender separately by fax of any message containing deadlines. In addition, E-Mail information cannot be <br />guaranteed to be secure or error -free as information could be intercepted, corrupted, lost, destroyed, arrive late <br />or incomplete, or contain virus. Therefore, the sender does not accept liability for any errors or omissions in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.