My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Potawatomi Zoo Parking Lot Expansion Proj No. 115-129A - Ritschard Bros., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 1 - Potawatomi Zoo Parking Lot Expansion Proj No. 115-129A - Ritschard Bros., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:48:37 PM
Creation date
12/14/2016 3:03:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Richard Estes, Engineer I <br />SUBJECT: Potawatomi Zoo Parking Lot Expansion <br />Change Order 1 <br />Project No. 115-129A <br />DATE: December 13, 2016 <br />Here is an explanation for the Change Order being submitted. <br />The reason(s) for the Change Order request is as follows: <br />During final preparation of the subbase for laying the asphalt pavement, the contractor <br />noticed that the original plan to mill down the existing asphalt drive was not possible due to <br />the significant elevation difference between what existed and what was proposed. The mill <br />would have been over 8 inches which would have gone beyond the depth of the existing <br />asphalt pavement. To correct this and still provide a method of drainage for the new <br />parking lot, the decision was made to raise the proposed elevations near the area of the <br />existing asphalt crown enough to allow for the mill to occur, while also providing a minimum <br />slope of 1 % to promote drainage of the parking lot. The cost for the work will be $9,381.00. <br />2. Also during this project, the contractor was forced to wait for AEP to relocate 2 existing light <br />poles that were in the location of the new parking lot expansion. This delay, along with the <br />additional time needed to perform the additional grading work, resulted in a time extension <br />request of twenty-two (22) calendar days from the originally scheduled completion date. <br />Please call me with your questions (5896). <br />