Laserfiche WebLink
City of South Bend Project No. 116-083G <br />Change Order No. 1 - 1218/16 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Roger T. Nawrot, P.E. <br />Professional Engineer No. 60016991 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />PROJECT: Ireland Road Storm Repairs <br />Project No. 116-083G <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: December 8, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item Qty Unit Price Total <br />1. Install Catch Basin 1 LS $15,750.00 $15,750.00 <br />2. Remove Line Items N/A N/A ($8,270.15) ($8,270.15) <br />1. Install Catch Basin <br />A catch basin is needed to incorporate an existing storm pipe running through the <br />Erskine golf course. Work will include rolling up a large portion of the erosion control mat <br />(Flexamat), excavation around the existing storm pipe, saddling a structure around the pipe, <br />backfilling, and fine grading the finished product. Additional Flexamat anchors will be ordered <br />and installed to secure the mat. <br />2. Remove Line Items <br />Some line items were not needed. They were included as an "as needed' item. The <br />current work has found that they are not necessary. <br />