My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Chippewa Avenue Emergency Repairs Proj No. 116-083F - JCI Bridge Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 1 - Chippewa Avenue Emergency Repairs Proj No. 116-083F - JCI Bridge Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:48:03 PM
Creation date
12/14/2016 2:59:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 116-083F <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />RogerT. Nawrot, P.E. <br />Professional Engineer No. 60016991 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />PROJECT: Chippewa Avenue Emergency Repairs <br />Project No. 116-083F <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: December 1, 2016 <br />Change Order No. 1 - 12/8/16 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by <br />this Change <br />Order: <br />Item <br />QQt r <br />Unit <br />Price <br />Total <br />1. Increase Field Drilling <br />117 <br />EA <br />$20.00 <br />$2,520.00 <br />2. Increase Concrete <br />5.615 <br />CYD <br />$1,100.00 <br />$6,176.50 <br />3. Increase Rebar <br />673 <br />LBS <br />$1.00 <br />$673.00 <br />1. Install Field Drilling <br />The number of field drilled holes is increased in order to add more rebar to anchor -in and <br />support the existing arch. This will allow for the existing arch section to be reused and eliminate <br />lead times for a new arch section. <br />2. Increase Concrete <br />Additional concrete is needed to anchor in the existing arch section per #1 above. <br />3. Increase Rebar <br />Additional rebar is needed to anchor in the existing arch and concrete per #1 above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.