My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Opening - Fire Station #4 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Bid Opening - Fire Station #4 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:14:00 PM
Creation date
12/14/2016 2:49:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALTERNATES CONTINUED <br />Item <br />No. <br />Description <br />Total Amount <br />REMOVAL OF SITE PERIMETER CONCRETECURB: <br />PROVIDE A COST TO REMOVE AND REPLCONCRETE CURB5 <br />THAT BOUNDS THE PROPERTY'S PERIMEG OLIVE STREET, <br />C ooLINDEN <br />AVENUE, AND ORANGE STREET. T C1.0. <br />ALTERNATE #5 TOTAL 5(, 0 C)O <br />Item <br />No. <br />Description <br />Total Amount <br />REMOVAL AND REPLACEMENT OF SITE PERIMETER CONCRETE <br />SIDEWALK: <br />PROVIDE A COST TO REMOVE AND REPLACE THE INDICATED <br />5-7000 <br />6 <br />CONCRETE SIDEWALK THAT BOUNDS THE PROPERTY'S PERIMETER <br />, <br />ALONG OLIVE STREET, LINDEN AVENUE, AND ORANGE STREET. SEE <br />SHEET C1.0 FOR DEMOLITION EXTENT; SEE SHEET CIA FOR NEW <br />CONSTRUCTION KEYNOTE #8 AND #11 . <br />ALTERNATE #6 TOTAL 51,000 <br />Item <br />No. <br />Description <br />Total Amount <br />NEW SITE PERIMETER ORNAMENTAL FENCING- <br />7 <br />PROVIDE A COST TO FURNISH AND INSTALL 4'H AND 6'H ORNAMENTAL <br />FENCING <br />AS INDICATED BY KEYNOTE #10 ON SHEET C1.1. <br />+ <br />ALTERNATE #7 TOTAL 30,000 <br />Item <br />No. <br />Description <br />Total Amount <br />EXTERIOR WALL BASE, ACCENT BAND, WINDOW SILL, AND WALL CAP <br />qiU C+ <br />PRECAST SUBSTITUTION: <br />8 <br />PROVIDE A COST TO FURNISH AND INSTALL 16"H BASE, 8"H ACCENT <br />Q <br />BAND, AND 8"H WALL CAP IN CAST STONE IN LIEU OF LIMESTONE AS <br />v t a�� <br />INDICATED BY KEYNOTE #65, KEYNOTE #75, KEYNOTE #77, AND <br />KEYNOTE #116 AND BY ELEVATION KEYNOTES #E1 AND #E8. <br />ALTERNATE #8 TOTAL Q � U 00 <br />Item <br />No. <br />Description <br />Total Amount <br />Furniture and Equipment package: Price to furnish and install all Furniture and <br />9 <br />Equipment as indicated on the Furniture Schedule and on the Equipment <br />Schedule, <br />�� �� <br />both shown on Sheet 11-100. <br />ALTERNATE #9 TOTAL I D g 1 a 0 0 <br />Version 10/18/2016 Contractor's Bid for Public Works - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.