My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Opening - Fire Station #4 - Majority Builders, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Bid Opening - Fire Station #4 - Majority Builders, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:13:27 PM
Creation date
12/14/2016 2:48:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name <br />Project No. <br />For Bids Due <br />BASE BID <br />J <br />�ov III <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />sa> <br />Fire Station #4 <br />166-066 <br />December 13, 2016 <br />Item <br />No. <br />Description <br />Total Amount <br />1 <br />Base Bid <br />3, 43 000 ` <br />BASE BID TOTAL <br />ALTERNATES <br />Item <br />No. <br />Description <br />Total Amount <br />SECOND FLOOR BATHROOM WINDOWS: <br />1 <br />FURNISH AND INSTALL WINDOW TYPE "D" AT SECOND FLOOR <br />+$2, 390.00 <br />BATHROOM LOCATIONS, QUANTITY: FOUR (4). <br />ALTERNATE #1 TOTAL _$2, 390, 00 <br />Item <br />No. <br />Description <br />Total Amount <br />ALTERNATE LOCATION FOR SOLAR PANEL ROOF ARRAY: <br />2 <br />INSTALL 325W 72 CELL SOLAR PANEL MODULE AT PITCHED (6/12) <br />+$240.00 <br />STANDING SEAM METAL ROOF LOCATION IN LIEU OF TPO ROOF <br />LOCATION ABOVE APPARATUS BAY. SEE ROOF PLAN 1/A1-300. <br />ALTERNATE #2 TOTAL $ 240.00 <br />Item <br />No. <br />Description <br />Total Amount <br />APPARATUS BAY DOOR SELECTION: <br />PROVIDE A COST TO FURNISH AND INSTALL "STEEL RANGER 9000L" <br />(_$10, 000.00 <br />3 <br />HIGH PERFORMANCE ROLLING STEEL DOORS BY HORMANN FLEXON <br />LLC AT EACH OF THE FOUR (4) APPARATUS BAY APPARATUS DOORS <br />IN LIEU OF THE BASE BID SELECTION. <br />ALTERNATE #3 TOTAL (-$10, 000.00) <br />Item <br />No. <br />Description <br />P <br />Total Amount <br />APPARATUS BAY DOOR SELECTION: <br />PROVIDE A COST TO FURNISH AND INSTALL "SOLID SHEETED FOUR <br />+7, 450.00 <br />4 <br />FOLD DOORS" BY DOOR ENGINEERING AND MANUFACTURING AT <br />EACH OF THE FOUR (4) APPARATUS BAY APPARATUS DOORS IN LIEU <br />OF THE BASE BID SELECTION. <br />ALTERNATE #4 TOTAL +$7,450.00 <br />r <br />Version 10/18/2016 Contractor's Bid for Public Works - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.