My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Opening - Fire Station #4 - Brown & Brown Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Bid Opening - Fire Station #4 - Brown & Brown Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:12:28 PM
Creation date
12/14/2016 2:47:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Description Total Amount <br />REMOVAL OF SITE PERIMETER CONCRETE CURB: <br />PROVIDE A COST TO REMOVE AND REPLACE THE CONCRETE CURB <br />THAT BOUNDS THE PROPERTY'S PERIMETER ALONG OLIVE STREET, <br />LINDEN AVENUE, AND ORANGE STREET. SEE SHEET C1.0. / 6W <br />ALTERNATE #5 TOTAL <br />Item <br />No. I Description I TotalAmount] <br />r� <br />SIDEWALK: -"" """ "-r^vvivL RC IC <br />PROVIDE A COST TO REMOVE AND REPLACE THE INDICATED <br />CONCRETE SIDEWALK THAT BOUNDS THE PROPERTY'S PERIMETER <br />ALONG OLIVE STREET, LINDEN AVENUE, AND ORANGE STREET. SEE <br />SHEET C1.0 FOR DEMOLITION EXTENT; SEE SHEET C1.1 FOR NEW <br />CONSTRUCTION (KEYNOTE #8 AND #11). <br />ALTERNATE #6 TOTAL Aff-I Ur <br />I No, I Description I Total Amount I <br />.+"'' ' "I'vlc I crt UKNANItN I AL FENCING: <br />7 PROVIDE A COST TO FURNISH AND INSTALL 4'H AND 6'H ORNAMENTAL <br />FENCING AS INDICATED BY KEYNOTE #10 ON SHEET C1.1. <br />ALTERNATE #7 TOTAL <br />I No, I Description I Total Amount] <br />_...._, ruvv vvmLL i. r <br />PRECAST SUBSTITUTION: \ <br />PROVIDE A COST TO FURNISH AND INSTALL 16"H BASE, 8"H ACCENT \/1 <br />BAND, AND 8"H WALL CAP IN CAST STONE IN LIEU OF LIMESTONE ASJ <br />INDICATED BY KEYNOTE #65, KEYNOTE #75, KEYNOTE #77, ANDO� - <br />KEYNOTE #116 AND BY ELEVATION KEYNOTES #E1 AND #FR <br />ALTERNATE #8 TOTAL <br />Item <br />No. Description Total Amount <br />lu "4ulYl1 1C Pacrcage: rnce to turnish and install all Furniture and <br />9 1 Equipment as indicated on the Furniture Schedule and on the Equipment `Dz,o( <br />Schedule both shown on Sheet 11-100. <br />ALTERNATE #9 TOTAL <br />Version 10/18/2016 Contractor's Bid for Public Works - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.