My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Woodruff & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Woodruff & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:35:51 PM
Creation date
12/13/2016 9:16:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION I EXPERIENCE QUESTIONNAIRE <br />1. What public works projects has your organization completed for the one (1) year prior to the date of the current bid? <br />Contract Amount <br />Class of Work <br />When Completed <br />Name and Address of Owner <br />Hobart Sanitary District <br />$ 2,564,000 <br />Drains a Im rovements <br />2015 <br />49th Avenue and South Live ool <br />Michigan City Redevelopment <br />$ 136,400 <br />Sewer Installation <br />2015 <br />Commission, Dunes Plaza Phase III <br />Michigan City Sanitary District <br />$ 130,488 <br />Sanitary Sewer <br />2015 <br />Michi an Blvd Extension Project <br />City of South Bend <br />$ 295,888 <br />Sewer Installation <br />2015 <br />Western Ave Corridor <br />Indiana American Water <br />$ 916,521 <br />Water Main Installation <br />2015 <br />Polk Street and Van Buren Place/Street <br />Michigan City Water Works Dept <br />$ 2fi8,000 <br />Water Main <br />2016 <br />Pottawattamie Park <br />Michigan City Redevelopment <br />$ 1,701,956 <br />Road Im rovements <br />2016 <br />Wabash Street Im rovements <br />2. What public works projects has your organization now in process of construction? <br />Contract Amount <br />Class of Work <br />When to be <br />Name and Address of Owner <br />Com leted <br />Space Center DBA La Porte, LLC <br />$ 1,633,754 <br />Sewer Installation <br />2016 <br />Thomas Rose Industrial Park <br />Rieth Riley South Bend <br />$ 1,467,067 <br />Stone Sewer/Draina e <br />2016 <br />One Wa -Two Wa Street Conversion <br />Tone and Blank/Franciscan St Anthony <br />$ 1,761,889 <br />Under round Uti]ities <br />2017 <br />Re ]acement Hospital <br />3. Have you ever failed to complete any work awarded to you? NO If so, where and why? <br />4. List references from private firms for which you have <br />Haas & Associates. Engineers <br />Michigan City, IN <br />Timothy J. Haas <br />Larson -Danielson Construction. <br />La Porte IN <br />Thomas C. Larson <br />U.S. Aluminate <br />Michigan City, IN <br />Peter Askew <br />Walsh Construction <br />La Porte IN <br />Ken Warrick <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />1. Explain your plan or layout for performing proposed work (Examples could include a narrative of when you could begin work, complete the project, number of <br />workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) <br />**Woodruff & Sons, Inc. will construct the work of the project in accordance with Contract Documents as issued by the Owner and as prepared by the <br />Engineer. <br />2. Please list the names and addresses of all subcontractors (i.e. persons or fines outside your own firm who have performed part of the work) that you have used <br />on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. <br />**Rieth-Riley and Walsh & Kelly, asphalt paving and concrete. <br />3 If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you <br />expect to require a bond. However, if you me unable to currently provide a listing, please understand, a listing must be provided prior to contract approval <br />"*Not Determined at this time <br />4. What equipment do you have available to use for the proposed project?. Any equipment to be used by subcontractors may also be required to be listed by the <br />governmental unit. <br />12 Loaders 14 Backhoes 1 Mobile Mixer 40 Trucks, Trailers, and Cars <br />3 Pavers 5 Dozers 2 Compactors I Vertical Drill <br />3 Rollers 3 Boring Machines 2 Concrete Breakers Trench Protection Equipment <br />I Conveyor 5 Graders 1 Scraper 6 Wellpoint Systems, Pumps <br />3 Cranes 12 Compressors <br />5. Have you entered into contracts or received offers for all materials which substantiate prices used in preparing your proposal? <br />If not, please explain the rationale used which would corroborate the prices listed. <br />**Yes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.