My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Woodruff & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Woodruff & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:35:51 PM
Creation date
12/13/2016 9:16:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bid Bond <br />CONTRACTOR: <br />(A4nue, legal suits and addrecr) <br />Woodruff & Sons, Inc. <br />2125 E US Highway 12 <br />Michigan City, IN 46304 <br />OWNER: <br />Wane. legal startus and address) <br />Document A310 TM - 2010 <br />Conforms with The American Institute of Architects AIA Document 310 <br />SURETY: <br />(,'1'nnte, legal srnais mid prfircipal place rfl urblety) <br />Hartford Accident and Indemnity Company <br />One Hartford Plaza <br />Hartford, CT 06155 - 0001 <br />Mailing Address for Notices <br />City of South Bend, Indiana, Department of Public Works <br />Count City Building, Room 1316 <br />227 West Jefferson Blvd <br />South Bend, FL 46601 <br />BOND AMOUNT: $ 5% Five Percent of Amount Bid <br />This document has important <br />legal consequences. Consultation <br />with an attorney is encouraged <br />with respect to Its completion or <br />modification. <br />Any singular reference to <br />Contractor, Surety, Owner or <br />other party shall be considered <br />plural where applicable. <br />PROJECT: <br />(.tierce, location or addm,= mrdProjeclmrniber, lfmr}) <br />Project No. 116-053 - Calvert Street Lift Station Replacement Project - South Bend, IN. <br />The Contractor and Surcty arc bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind <br />themselves. their heirs, executors, administrators, successors and assigns jointly and severally, as provided herein. The conditions of this <br />Bond arc such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period <br />as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with <br />the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in <br />the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt <br />payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed ilia amount of <br />this Bond, between the amount specified in said bid and such larger amount forrhich the Owner may in good faith contract with another <br />party it) perlbron [lie work covered by said bid, then this obligation shall be null and void, otherwise to rennin in full three and eflbcl. The <br />Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the <br />bid. Waiverol'notice by the Surely, shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for <br />acceptance ol'bids specified in the bid dhwunhents, and Elie Owner and Contractor Shull obtain the Surely's consent lire an extension beyond <br />sixty (60) days. <br />If this Bond is issued in connection with a subcontractor's bid to a Contractor, the tern Contractor in this Bond shall be deemed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />When this Bond has been lihmished to comply with a statutory or other legal requirement in [lie loculion ol'the Project, any pmvisian in <br />this Bond conflicting with said statutory or legal requirenhenl shall be deemed deleted herelinm and provisions conlihmting to such <br />slalulory ar other legal requirenhent skull be deemed incorporated herein. When so) lihmished, the intent is that this Bond shell be anstrued <br />as a statutory, bond and not as a common law bond. <br />Signed and scaled this 1 St day of December, 2016. <br />(11?111ess) Mi ae A. Edinger <br />(IP(aiext) <br />S-0054/AS S/10 <br />Woodruff & Sons, Inc <br />(Principal) (seal) <br />By: <br />Rrlle) Todd R. Bell,, Vice Preside <br />Hartford Accident and of deity C <br />
The URL can be used to link to this page
Your browser does not support the video tag.