Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Calvert Street Lift Station Replacement <br />Project No. 116-053 <br />For Bids Due December 8, 2016 <br />BASE BID <br />Item <br />No <br />Description <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />$19,245.00 <br />$19,245.00 <br />2 <br />Maintaining Traffic <br />I <br />LS <br />$1,864.80 <br />$1,864.80 <br />3 <br />Clearing Right of Way <br />1 <br />LS <br />$13,205.00 <br />$13,205.00 <br />4 <br />Construction Engineering <br />I <br />LS <br />$4,133.00 <br />$4,133.00 <br />5 <br />ITemporary Erosion and Sediment Control <br />1 <br />I LS <br />$4,750.001 <br />$4,750.00 <br />6 <br />1 Maintain Flow <br />1 <br />I LS <br />$20,927.001 <br />$20,927.00 <br />7 <br />Dewatering <br />1 <br />I LS <br />$98,920.001 <br />$98,920.00 <br />8 <br />Curb and Gutter, Type'B' <br />20 <br />1 LFT <br />$65.00 <br />$1,300.00 <br />9 <br />Compacted Aggregate, No. 53, Base <br />120 <br />TON <br />$25.00 <br />$3,000.00 <br />10 <br />Concrete Pavement Patching <br />80 <br />SYS <br />$94.36 <br />$7,548.80 <br />11 <br />PCCP for Drive, 9" <br />280 <br />SYS <br />$64.50 <br />$18,060.00 <br />12 <br />1 Chain Link Fenc, PVC Coated, 6' Ht <br />296 <br />LFT <br />$46.62 <br />$13,799.52 <br />13 <br />Chain Link Swing Gate, 20' Opening, Double <br />Leaf <br />1 <br />LS <br />$3,136.00 <br />$3,136.00 <br />14 <br />Top Soil <br />320 <br />CYS <br />$10.00 <br />$3,200.00 <br />15 <br />Mulch Seeding <br />2800 <br />SYS <br />$2.44 <br />$6,832.00 <br />16 <br />Doghouse Manhole, 6' Dia. <br />2 <br />EA <br />$7,700.00 <br />$15,400.00 <br />17 <br />Manhole, Drop Type, 6' Dia. <br />1 <br />EA <br />$12,941.87 <br />$12,941.87 <br />18 <br />Manhole, 6' dia. <br />1 <br />EA <br />$9,576.96 <br />$9,576.96 <br />19 <br />Force Main, 8" Dia. <br />114 <br />LFT <br />$191.461 <br />$21,826.44 <br />20 <br />Sanitary Sewer, 24" Dia. <br />108 <br />LFT <br />$179.451 <br />$19,380.60 <br />21 <br />Sanitary Sewer, 30" Dia. <br />92 <br />LFT <br />$199.77 <br />$18,378.84 <br />22 <br />Lift Station <br />1 <br />LS <br />$665,187.16 <br />$665,187.16 <br />23 <br />Lift Station Electrical <br />1 <br />LS <br />$41,440.00 <br />$41,440.00 <br />24 <br />Lift Station Abandonment <br />1 <br />LS <br />$28,095.20 <br />$28,095.20 <br />25 <br />Sanitary Utility Signage <br />5 <br />EA <br />$134.40 <br />$672.00 <br />BASE BID TOTAL $1,052,820.19 <br />Contractor's Bid for Public Works - 7 <br />Version 10/18/2106 <br />