My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Haskins Underground, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Haskins Underground, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:32:46 PM
Creation date
12/13/2016 9:05:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HASKINS <br />UNDERGROUND, INC. <br />UTILITIES • SITE WORK • EROSION CONTROL <br />8111 9B Road <br />Plymouth, IN 46563 <br />RE: Form 96 <br />Section I <br />1. Project that Haskins Underground, Inc. has completed are as follows: <br />Tel- 574.935.3151 <br />Description <br />Amount <br />Owner <br />Lake Pleasant Sanitary <br />Sewer <br />1.1 mil <br />Steuben County Regional <br />Waste District <br />SR 19 Water Main <br />$288,050.00 <br />City of Nappanee <br />East Lake Shore Storm <br />Sewer <br />1.03 mil <br />Town of Culver <br />2. Public Works Projects that Haskins Underground Currently have contracts for are <br />Description <br />Amount <br />Owner <br />Stony Run Bank Stabilization <br />$99,000.00 <br />City of Ft. Wayne <br />Water Main Extension <br />$515,000.00 <br />City of Plymouth <br />3. Haskins Underground, Inc. has completed all contracts that have been awarded <br />4. Private References are as follows <br />Michiana Contracting P.O. Box 929, Plymouth, IN 46563 <br />Banner Electric, 1515 W. Jefferson St., Plymouth, IN 46563 <br />Section II <br />Start date would be February of 2017 weather permitting and after all shop drawings are submitted <br />and approved. Work would begin by installation of erosion control measures and clearing and <br />grubbing of site. Then dewatering would progress with the excavation of the bottom of the new wet <br />well to follow. While excavating steel would be tied. The majority of the tank would be poured <br />within 6 weeks. Piping would follow after. Then building of the interior of pump station, along with <br />
The URL can be used to link to this page
Your browser does not support the video tag.