My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Grand River Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - Calvert St. Lift Station Replacement - Proj No. 116-053 - Grand River Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:32:14 PM
Creation date
12/13/2016 9:04:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Grand River Construction, Inc. <br />General Contractors • Commercial and Industrial • Concrete Specialist <br />City of South Bend <br />Calvert Street Lift Station Replacement <br />Project 116-053 <br />December 08, 2016 <br />Bid Form Supplement Section II Item 1. Work Plan & Schedule <br />Proposed Work Plan <br />1. CONSTRUCT THE NEW LIFT STATION, CONTROLS AND APPURTENANCE. <br />2. INSTALL THE NEW SANITARY FORCEMAIN AND ALL APPURTENANCES & PRESSURE <br />TEST THE NEW SANITARY FORCEMAIN. <br />3. INSTALL THE NEW 24" & 30' SANITARY SEWER & TEST THE NEW SEWER. <br />4. CONSTRUCT THE NEW MANHOLES OVER THE EXISTING 24" & 15" SEWER. <br />5. COMPLETE ALL TESTING OF THE NEW LIFT STATION (INCLUDING PUMPS, CONTROLS). <br />6. COORDINATE THE INSTALLATION OF THE NEW ELECTRICAL FEED AND EXISTING <br />TELEMETRY FEED FOR THE NEW LIFT STATION WITH THE CITY OF SOUTH BEND AND <br />ELECTRIC UTILITY COMPANY. <br />7. CUT OUT THE EXISTING SEWER IN THE NEW MANHOLES AND REDIRECT THE FLOW <br />INTO THE NEW LIFT STATION. <br />8. OPERATE THE NEW WETWELL FOR NO LESS THAN SEVEN CALENDAR DAYS WITHOUT A <br />FAILURE OR ALARM CONDITION. DURING THIS PERIOD, THE EXISTING LIFT STATION <br />SHALL REMAIN OPERATIONAL FOR EMERGENCY SITUATIONS, PROVIDE A PORTABLE <br />GENERATOR, A VACTOR TRUCK AND BYPASS PUMPING IF THE NEW LIFT STATION <br />FAILS OR MALFUNCTIONS. <br />9. ABANDON THE OLD LIFT STATION, PIPING, ELECTRICAL EQUIPMENT, CONTROLS, <br />PIPING AND APPURTENANCES, PLUG THE ABANDONED EXISTING 4" FORCEMAIN, 12" <br />FORCEMAIN, 15' SANITARY SEWER, AND 24' SANITARY SEWER. <br />See attached schedule for anticipated sequence of events. <br />5025 401h Avenue, Hudsonville, MI 49426 grandriverconstruction.com <br />Phone: 616-669-5611 Fax: 616-669-3466 <br />
The URL can be used to link to this page
Your browser does not support the video tag.