My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Digester Gas Utilization Design - Project No. 116-050R - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - WWTP Digester Gas Utilization Design - Project No. 116-050R - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:38:49 PM
Creation date
12/13/2016 9:02:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION IV. ASSURANCES <br />1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an <br />Agreement with OWNER in the form included in the Bidding Documents to perform <br />all Work as specified or indicated in the Bidding Documents for the prices and within <br />the times indicated in this Bid and in accordance with the other terms and conditions <br />of the Bidding Documents. <br />2.01 Bidder accepts all of the terms and conditions of the Notice to Bidders and <br />Instructions to Bidders, including without limitation those dealing with the <br />disposition of Bid security. This Bid will remain subject to acceptance for 60 days <br />after the day of Bid opening, or for such longer period of time that Bidder may agree <br />to in writing upon request of OWNER. <br />3.01 In submitting this Bid, Bidder represents, set forth in the Agreement, that: <br />A, Bidder has visited the Site and become familiar with and is satisfied as to the <br />general, local and Site conditions that may affect cost, progress, and <br />performance of the Work. <br />B. Bidder is familiar with and is satisfied as to all federal, state and local Laws <br />and Regulations that may affect cost, progress, and performance of the Work. <br />C. Bidder has obtained and carefully studied (or assumes responsibility for <br />having done so) all additional or supplementary examinations, investigations, <br />explorations, tests, studies and data concerning conditions (surface, <br />subsurface and Underground Facilities) at or contiguous to the Site or <br />otherwise which may affect cost, progress, or performance of the Work or <br />which relate to any aspect of the means, methods, techniques, sequences and <br />procedures of construction to be employed by Bidder, including applying the <br />specific means, methods, techniques, sequences, and procedures of <br />construction expressly required by the Bidding Documents to be employed by <br />Bidder, and safety precautions and programs incident thereto. <br />D. Bidder does not consider that any additional examinations, investigations, <br />explorations, tests, studies or data are necessary for the determination of this <br />Bid for performance and furnishing of the Work at the price(s) bid and within <br />the times and in accordance with the other terms and conditions of the <br />Bidding Documents. <br />E. Bidder is aware of the general nature of work to be performed by OWNER <br />and others at the Site that relates to the Work as indicated in the Bidding <br />Documents. <br />SB WWTP Digester Gas Utilization Design <br />Project No. 116-050 R 0041 00-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.