Laserfiche WebLink
1'238 <br />3/13/72 <br />too <br />CY <br />Class "All Ready Mixed Concrete <br />per specificatlons 6 sack <br />FOB Vendor's plant <br />$16.50 <br />250 <br />CY <br />Class u.A'l Ready Mixed Concrete <br />Oer specifications 6 sack "delivered <br />in South Bend area in min, 6 yd. <br />Toads <br />FOB jobsite` <br />$18.85 <br />ADD <br />TI4E FOLLOWING TO ABOVE PRICES: <br />CY <br />2% Calsiw6 Chloride <br />.60 <br />CY <br />For winter` work '-' Nov. 15,1972 <br />through April 1­5 ' 1973 <br />1.25 <br />CY <br />Saturday A.M. or 3:30 P.M. Jobsite' <br />arrival or 'later'` <br />1.90 <br />CY <br />High Early Cement <br />.25 per bag add. <br />FOR <br />FRACTIONAL <br />LOADS ADD THE FOLLOWING: <br />1/4 yd, through i yd/ <br />12.00 <br />11/4 yd. through 13/4 yd. <br />10.00 <br />2 yd, <br />through 2 3/4 yd. <br />7.00 <br />3 yd. <br />through 3 3/4 yd. <br />4.Oo <br />WAITING TIME: <br />FIVE MINUTES PER YARD FREE TIME: <br />ALL OVER 0 12.00 per hour - <br />$1.00 per hour for 5 minutes <br />Non- collusion affidavit was found to be in proper form. A bid bond <br />in the amount of`10% of the bid accompanied the bid. <br />THE LEVY COMPANY, INC. P. 0. Box 29$; CHESTERTON, INDIANA <br />6,500 Ton SLAG #2 or`#3 Min. Agg. <br />delivered to Street Depart. <br />Minimum 22 ton loads $ 3.00 per ton <br />2,000 Ton Compacted Aggregare #53 or #73 <br />picked up by City Trucks at our <br />location 3.-55 per ton <br />2,000 Ton Compacted Aggregate #9 picked <br />up by City Trucks at our loca. 3.55 per ton <br />'1,000 Ton Compacted Aggregate Pit Run <br />picked up 1by City Trucks 1.20 <br />18,000 Ton Fine Aggregate #14-1 or 14-2 <br />picked up by city trucks .80 per ton <br />Non -collusion affidavit was found to be in proper form. A -bid bond"i'n <br />the amount of $8,000.00 accompanied the bid. <br />MATERIAL SERVICE CORPORATION, 300 West Washington, Chicago, inois <br />6,500 Tons Limestone Mineral Aggregate <br />delivered by semi -trailer to your <br />yard 3.60 per ton <br />150 Ton Mineral Filler meeting Ind. & Mich <br />State Highway specifications del. <br />to your yard. 11.95 per ton <br />Non- collusion affidavit was found to be in proper order. A bidder's <br />bond in the amount of $3,500.00 accompanied the bid. <br />E <br />1 <br />1 <br />