My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/25/73 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1973
>
06/25/73 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:42:13 PM
Creation date
11/30/2016 11:58:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/25/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />JUNE 25, 1973 <br />Bus Service - <br />will be available within 30 days. <br />Sewer Service - <br />begin construction within I year and complete <br />construction within 3 years of all trunk sewers. <br />Local sewers can be installed as requested by the <br />residents of the territory. <br />Parks - <br />maintenance of Clay Township Park to be assumed <br />immediately by the City and capital improvements <br />to the park to be completed within 3 years. <br />SECTION 4. The Board of <br />Public Works now establishes and adopts the <br />following fiscal plan for the <br />furnishing of said services: <br />Street Maintenance - <br />estimated annual cost of street maintenance for <br />Traffic Control <br />72 miles of streets will be $290,952. Annual <br />revenues received by the City from refund of <br />state collected motor vehicle gas taxes will be <br />$8.85 per capita and with an estimated popula- <br />tion of 10,830 producing $95,845. The balance <br />of the cost will be paid from appropriations <br />from revenue sharing funds. <br />Street Lighting <br />- estimated annual cost of street lighting for <br />streets to be lighted during the first year <br />will be $14,400, for the second year $43,200, <br />and for the third year $72,000. Annual cost <br />thereafter will be $86,400. The first two years <br />will be paid from appropriations from revenue <br />sharing funds. The last year will be paid from <br />tax revenues from the same fund that finances <br />the present street lighting. <br />Sanitation <br />- this service is provided for a fee of $3.00 <br />per month per family and is currently a self- <br />supporting service. No. City costs are assigned <br />to this service. <br />Bus <br />- bus service will be available to the proposed <br />area within 30 days. Estimated annual expense <br />to the City will be $40,411 and will be financed <br />in the same manner as existing bus service is <br />provided to the City. <br />Sewer <br />- Trunk sewers would be provided for the area <br />by the construction of $950,000 worth of 12, 15 <br />and 18 inch diameter pipes plus 2 sewage pumping <br />stations. The replacement cost of the existing <br />sewers and pumping station in the proposed area <br />owned by Clay Utilities, Inc, are estimated to <br />be worth $120,000. The total cost for trunk <br />sewer system would be $1,070,000. Financing of <br />this construction could be accomplished in several <br />ways. First, Federal Water and Sewer Grants are <br />expected in the near future for this type of con- <br />struction. Based on 75% Federal participation, <br />10% State participation and the remainder from <br />local sources, the local cost would be $160,500. <br />In the event this type of financing was unavail- <br />able general obligation bonds could be issued for <br />the construction of trunk sewers in the amount <br />of $1,070,000. Based on 5% interest and 25 year <br />term, the annual cost would be $75,919. The City <br />has the bonding capacity to float this amount <br />of loans. <br />Parks - <br />parks and open spaces within the territory to <br />be annexed consist of the Clay Park consisting <br />of 45 acres and school play areas consisting of <br />approximately 40 acres. The average park land <br />and open space available in the City is 7.17 <br />acres per 1,000 population. Total park land <br />and open space in the territory to be annexed <br />is approximately 85 acres. Maintenance of the <br />Clay Park would be assumed immediately by the <br />
The URL can be used to link to this page
Your browser does not support the video tag.