<br />REGULAR MEETING
<br />APRIL 1, 1974
<br />Kuert Concrete, Inc. Bid was signed by Charles Bratina,
<br />South Bend, Indiana non -collusion affidavit was in order
<br />and a 10% bid bond accompanied the bid.
<br />BID - 300 Yds. Class A Limestone Concrete @ 21.95 $6,585.00
<br />300 Yds, Class A Slag Concrete @ 21.45 6,435.00
<br />150 Yds. Class B Li.mestone Concrete @ 20.45 3,067.50
<br />150 Yds. Class B Slag Concrete @ 19.95 2,992.50.
<br />Above prices firm through July 31, 1974.
<br />300 Yds. Class A Limestone Concrete @ 22.55
<br />300 Yds..Class.A Slag Concrete @ 22.05
<br />150 Yds. Class B-Limestone Concrete @.20.95
<br />150 Yds. Class B Slag Concrete @ 20.45
<br />Above prices firm through December 31, 1974.
<br />Walsh & Kelly, Inc.
<br />South Bend, Indiana
<br />Bid was signed by .David G. Goodwin
<br />non -collusion affidavit was in order and
<br />10% bid bond accompanied the bid.
<br />Bid - 10,000
<br />Ton
<br />HAC
<br />Surface -Stone @
<br />11.30
<br />10,000
<br />Ton
<br />HAC
<br />Surface -Slag @
<br />12.55
<br />10,000
<br />Ton
<br />HAC
<br />Binder-#8 or #9
<br />8.95
<br />2,500
<br />Ton
<br />HAC
<br />Binder - #11 @
<br />10.05
<br />5,000
<br />Ton
<br />HAE
<br />Sand Surfave-IV
<br />14.80
<br />5,000
<br />Ton
<br />HAC
<br />Sand Surface -IV
<br />12.00
<br />5,000
<br />Ton
<br />Slag
<br />Surface -Spec
<br />16.10
<br />5,000
<br />Ton
<br />HAC
<br />Slag Surface-Specl3.55
<br />150
<br />Ton
<br />Bit.
<br />Mat. Tack
<br />120.00
<br />1,000
<br />Ton
<br />Bit.
<br />Patch. Mat.
<br />12.30
<br />The bid contained an escalator clause.
<br />$113,000.00
<br />125,500.00
<br />89.500.00
<br />25,125.00
<br />74,000.00
<br />6o,000.00
<br />80,500.00
<br />67,750.00
<br />18,000.00
<br />12,300.00
<br />St. Joseph Materials Co., Inc. Bid was signed by Wayne E. Hatchett,
<br />South Bend, Indiana non -collusion affidavit was in order and
<br />a 10% bid bond accompanied the bid.
<br />BID - 22,000
<br />Ton
<br />Min.
<br />Aggregate -Slag
<br />@ 3.75
<br />$7,500.00
<br />5,000
<br />Ton
<br />C. Aggregate #73
<br />@ 1.25
<br />62250.00
<br />8,000
<br />Ton
<br />Crse.
<br />Aggregate #9 Spec.
<br />@ 1.75
<br />14,000.00
<br />23,000
<br />Ton
<br />Fine
<br />Aggregate #14-1
<br />or 14-2 @ 1.00
<br />2,000.00
<br />8,000
<br />Ton
<br />Crse.
<br />Aggregate -Crusher
<br />Run 7/16 @ 3.25
<br />265,000.00
<br />300
<br />CY
<br />Ready.
<br />Mix Concrete
<br />@ 21.70
<br />6,510.00
<br />150
<br />CY
<br />Ready
<br />Mix Concrete
<br />@ 19.70
<br />2,955.00
<br />Western Materials Co. Bid was signed by R. F. Kepler, non -
<br />Lafayette, Indiana collusion affidavit was in order and
<br />a 10% bid bond accompanied the bid.
<br />BID - 5,000 Ton C. Aggregate #73 @ 1.30 $6,500.00
<br />82000 Ton Crse. Aggregate #9 Spec. @ 1.75 141,000.00
<br />2,000 Ton Fine Aggregate #14-1 or 14-2 @ 0.90 1,800.00
<br />Upon motion made, seconded and carried, the bids were referred to Mr. Decker, Director
<br />Division of Transportation, for review and recommendation.
<br />HEARING ON ASSESSMENT ROLL - CAMBRIDGE DRIVE SEWERS
<br />This being the date set, hearing was held on Assessment Roll No. 2969 for the
<br />construction of a sewer in the Crest Manor Subdivision from Miami Road to Kindig
<br />Drive at the rear of the north side of Cambridge Drive, authorized under Improvement
<br />Resolution No. 3386, 1973, adopted by the Board on October 15, 1973.
<br />The Clerk tendered proofs of publication of notice in the South Bend Tribune and
<br />the Tri-County News which were found to be sufficient.
<br />There were no remonstrators present and no written remonstrances having been
<br />received, the Board, upon motion made, seconded and carried, confirmed the
<br />Assessment Roll adopted by the Board on the 18th day of March, 1974.