Laserfiche WebLink
4 _0 C,J <br />REGULAR MEETING MAY 17, 1976 <br />BONDS RELEASED <br />Ray S. Andrysiak, Bureau of Engineering, reported to the Board <br />that requests had been received from surety companies for the <br />release of the following bonds: <br />Bartolini Excavating Co. Excavation Bond No. 1367 082 <br />i <br />Robert L. Stickler, Excavation Bond No. 1 401 20 <br />Leon Yoder Custom Homes, Contractor's Bond No. 40-207715 <br />Mr. Andrysiak said the bonds have been reviewed and the contractors <br />have no outstanding permits or claims against them. He recommended <br />that the Board release the bonds. Upon motion made by Mr. Farrand, <br />seconded by Mr. Brunner and carried, the bonds listed above were <br />released, effective May 17, 1976. <br />STREET LIGHT OUTAGE REPORT FILED <br />The Street Light Outage Report for the period of May 10 through <br />14 was received. The report indicated 22 outages. Upon motion <br />made by Mr. Farrand, seconded by Mr. Brunner and carried, the <br />report was ordered,f iled. <br />TITLE SHEET APPROVING PLANS FOR SOUTHEAST PARK APPROVED <br />The Title Sheet approving the plans for Southeast Park was <br />submitted to the Board. David Wells, Manager of the Bureau of <br />Design and Administration, informed the Board that this project <br />C was designed by the Bureau of Design and Administration and,: <br />for that reason, is being submitted to the Board for approval. <br />Further action on the project will be taken by the Board of Park. <br />Commissioners. The Department of Public Works will be inspecting <br />the project. Upon motion made by Mr. Farrand, seconded Iby Mr. <br />Mullen and carried, the title sheet approving the plans for the <br />Southeast Park project was signed by the Board. <br />STREET LIGHT INSTALLATIONS APPROVED <br />Ralph Wadzinski, Manager of the Bureau of Traffic and Lighting, <br />submitted the following recommendation for street light <br />installations to the Board: <br />A. Clayton Drive. Install five 7,000L, Mv,OH, WP @ $4.78 mo. <br />Replace a 4,000L, OH, WP with a 7,000L <br />MV, OH, WP - net increase of $1.147 mo. <br />Total increase $25.057/mo. or $300.68/yr. <br />B. Kevin Court Install a 7,000L, MV, OH, WP @ $4.782/mo. <br />or $57.38/yr. <br />C. York Road Replace three 4,000L, INC, OH, WP with <br />three 7,000L, MV, OH, WP @ $1.147 increase/mo. <br />Total increase $3.441/mo. or $41.29/yr. <br />Upon motion made by Mr. Farrand, seconded by Mr. Brunner and <br />carried, the installations were approved. <br />REQUEST TO PURCHASE PROPERTY AT 711 LA PORTE RECEIVED <br />The Board received a letter from Richard Ludwick expressing an <br />interest in purchasing a lot at 711 LaPorte Avenue. Upon motion <br />made by Mr. Farrand, seconded by Mr. Brunner and carried, the <br />request was filed and referred to the Department of Public Works <br />and the Department of Redevelopment for review and recommendation. <br />