Laserfiche WebLink
3 <br />REGULAR IIEETI14G <br />MARCH 22, 1976 <br />A regular meeting of the Board <br />9:30 a.m, on Monday, March 22, <br />with Mr. Farrand, Mr. Brunner <br />City Attorney William Stanley <br />of Public Works was convened at <br />1976 by President Rollin Farrand <br />and Mr. Mullen present. Deputy <br />was also present. <br />OPENING OF BIDS - BUREAU OF STREETS MATERIALS <br />This was the date set for receiving bids for materials for the <br />Bureau of Streets for 1976. The Clerk tendered proofs of publication <br />of notice in the South Bend Tribune and the Tri-County News which <br />were found to be sufficient. The following bids were opened and <br />publicly read: <br />Rose Fuel & Materials, Inc. Bid was signed by Paul 11. Lehner, <br />South Bend, Indiana Jr., non -collusion affidavit was <br />in order and a certified check <br />was submitted with the bid. <br />Bid 3000 Bags Portland Cement @ $3.25 - Total - $9,750.00 <br />Walsh & Kelly, Inc. Bid was signed by Thomas O. Walsh, <br />South Bend, Indiana non -collusion affidavit was in <br />order and a 1070 bid bond was <br />submitted. <br />Bid - <br />15,000 Tons HAC Surface Limestone @ 10.95 - $164,250.00 <br />15,000 Tons HAC Surface Slag @ 11.30 - 169,500.00 <br />20,000 Tons 11AC Binder #8 or #9 @ 9.50 190,000.00 <br />2,500 Tons HAC Binder #11 @ 9.60 24,000.00 <br />5,000 Tons HAE Sand Surface - Type IV @ 14-50 72,500.00 <br />5,000 Tons HAC Sand Surface -Type D @ 10.90 54,500.00 <br />5,000 Tons HAE Slag Surface - Spec. @ 17.00 85,000.00 <br />5,000 Tons-HAC Slag Surface - Spec. @ 13.20 66,000.00 <br />150 Tons Bit. Material Tack @ 115.00 17,250.00 <br />1,000 Tons Bit. Patching Material @ 13.55 .13,550.00 <br />Rieth-Riley Construction Co. Bid was signed by Richard D. <br />South Bend, Indiana Ruhlman, non -collusion affidavit <br />was in order and a 10°o bid bond <br />Bid - was submitted. <br />15,000 Tons HAC Surface Limestone @ 12.30 - $184,500.00 <br />15,000 <br />Tons <br />HAC <br />Surface -Slag @ 12:70 <br />- <br />190,500.00 <br />20,000 <br />Tons <br />HAC <br />Binder - #8 or #9 @ <br />9.55 - <br />191,000.00 <br />2,500 <br />Tons <br />HAC <br />Binder - #11 @ 11.00 <br />- <br />27,500.00 <br />5,000 <br />Tons <br />HAE <br />Sand Surface -Type IV <br />16.40- <br />82,000.00 <br />5,000 <br />Tons <br />HAC <br />Sand Surface -Type D <br />12.50- <br />62,500.00 <br />5,000 <br />Tons <br />HAC <br />Slag -Surface -Spec @ <br />18.20 - <br />91,000.00 <br />5,000 <br />Tons <br />HAC <br />Slag Surface -Spec @ <br />14.25 - <br />71,250.00 <br />1,000 <br />Tons <br />Bit. <br />Patching Material @ <br />14.80 <br />14,800.00 <br />Westville Oil & Manufacturing Co. Bid was signed by Andrew Carson, <br />Westville, Indiana non -collusion affidavit was in <br />order and a 10% bid bond was <br />submitted. <br />Bid - <br />175,000 gals. Road Oil @ $0.15 per gal. - $26,250.00 <br />St. Joseph Materials Company, <br />South Bend, Indiana <br />Bid was signed by Richard Marese, <br />non -collusion affidavit was in <br />order and a 10% bid bond was <br />submitted. <br />Bid 2,000 Tons Fine Aggregate 14-2 @ 1.10 - $2,200.00 <br />I� <br />