My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11082016 Board of Public Works Agenda
sbend
>
Public
>
Public Works
>
Minutes
>
2016
>
11082016 Board of Public Works Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:40:04 PM
Creation date
11/23/2016 10:41:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGi7T.AR MEETING NOVEMBER 8,201 349 <br />Division F Base Bid Total <br />$32,915.00 <br />Division F Alternate #1 Total <br />$2,720.00 <br />Division Base Bid+Alternate 41 Total <br />$35,635 00 <br />Division G Base Bid Total <br />$14,586.00 <br />Division H.Base Bid Total <br />$14,959.00 <br />Division I Base Bid Total <br />$27,570.00 <br />Division I Alternate #1 Total <br />59,790.00 <br />Division I Base Bid + Alternate #1 Total <br />$37,360.00 <br />Total Base Bid + Alternates: $135,408.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Domu and carried, the above bids were <br />referred to Engineering for review and recommendation. <br />OPENING OF BIDS — 2016 PARKING GARAGE IMPROVEMENTS — PROJECT NO. 115- <br />143 (PARKING GARAGE FUND) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />GIBSON-LEWIS. LLC <br />1001 W. III, St. <br />Mishawaka, IN 46544 <br />Bid was signed by: Robert Lingenfelter <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />ED <br />Base Bid Division A <br />S269,920.00 <br />Base Bid Division R <br />S287,720.00 <br />Base Bid Division C <br />S285,3 t0.00 <br />Base Bid Division D <br />$277,450.00 <br />Alternate #1 Division B Additional $12,300.00 <br />Alternate #2 Division D Additional <br />$12300.00 <br />Alternate #3 Division A Deduct <br />($47,000.00) <br />Alternate 44 Division B Deduct <br />-Alternate <br />($47,500A0) <br />#5 Division C Deduct <br />($48,500.00 <br />Altemate #6 Division D Deduct <br />($47,500.00) <br />Total Base Bid plus Alternates: $954,500,00 <br />R. YODER CONSTRUCTION INC. <br />PO Box 69 <br />Nappanee, IN 46550 <br />Bid was signed by: Kevin Yoder <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />Base Bid Division A <br />$291,337A0 <br />Base Bid Division B <br />$315,622.00 <br />Base Bid Division C <br />$307,421.00 <br />Base Bid Division D <br />$313,133.00 <br />Alternate 41 Division B Additional $0 <br />AI#ernate #2 Division ll Additional $0 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.