My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - 2016 Traffic Calming Solar Speed Indicators 116-035 - Michiana Contracting, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Quotations - 2016 Traffic Calming Solar Speed Indicators 116-035 - Michiana Contracting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:49:54 PM
Creation date
11/23/2016 9:44:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oura rrfi <br />.G <br />CITY OF SOUTH BEND, I► DIIANA } <br />CONTRACTOR'S 9UPTE FOR EMALIC�UVC <br />l865 <br />PROJECT NAME: 2016 —Traffic Calming Solar Speed Indicators <br />PROJECT NO. 116-035 <br />QUOTES DUE November 22. 2ft1C, of g•zna. <br />(Must be completed for all quotes. Please type or print) <br />Date; 11/22/2016 Firm: Michiana Contracting, Inc. <br />Address: 7843 Lilac Road (shipping) PO Box 929 (mailing) <br />City/State/Zip: Plymouth, IN 46563 Telephone Number: (674 )936-8613 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers tc furnish labor and/or material necessary to rornplete the <br />public works project of: <br />2016-Traffic Calming Solar Speed Indicators <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated I for the sum of (enter the Total Quote as shown on the Proposal) <br />Twenty eight thousand nine hundred forty dollars ($28,940.00 ) <br />(Enter Sum of Total (Quo(e plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this <br />Subject to the <br />following conditions <br />BOARD OF PUBLIC WORKS <br />Cary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />(Signature) <br />Donald W. Wendel, President <br />(Pr(nte Name ofPerson Signing) <br />ACCEPTANCE <br />day Of <br />Suzanna M. Frilzborg, Member <br />Therese J. Dorau, Mornber <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 10/18/2016 Page - 8 Puhlic Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.