My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Ideal Consolidated, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Ideal Consolidated, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:48:36 PM
Creation date
11/23/2016 9:35:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IDEAL <br />! ulnOLl IIATP.ft ��� <br />11. Inspect air filters. <br />12. Check fan assembly. <br />13. Check temperature and operating controls. <br />14. Check and calibrate safety controls. <br />15. Check unit for refrigerant leaks. <br />16. Check starter contacts for wear. <br />17. Check oil level in compressor (where applicable). <br />18. Check crankcase heater. <br />19. Check compressor operating refrigerant pressures. <br />20. Check compressor voltage and amperage. <br />COVE - UNIT HEATER <br />1. Lubricate fan and motor bearings per manufacturer's recommendations. <br />2. Brush and clean fan and housing as required. <br />3. Inspect wiring and tighten electrical connections. <br />4. Check all contactors and relays for wear. <br />5. Check unit operation. <br />6. Check safety controls. <br />7. Brush and clean coil (water and steam units). <br />8. Check steam trap. <br />9. Check operating fan current and voltage. <br />10. Check entering and exiting air temperature. <br />11. Check entering and leaving water temperature (water units only). <br />CENTURY CENTER - AERCO BOILERS <br />1. Check and record inlet gas pressure. <br />2. Check gas cushion diaphragm assembly for fatigue. <br />3. Replace gas cushion diaphragms. <br />4. Check settings and test all operating controls. <br />5. Check settings and test all safety controls. <br />6. Check operation of combustion prove switch. <br />7. Check operation of program timer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.