My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Havel Shambaugh
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Proposals - HVAC Preventative Maintenance Plan for VPA - Havel Shambaugh
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:48:09 PM
Creation date
11/23/2016 9:34:02 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOILERS <br />Q Check for proper boiler sequence. <br />❑ Check piping, connections, valves for leaks. <br />Q Check boiler sections for leaks. <br />Q Check water make-up system. <br />❑ Check room air intake system. <br />Q Check all boiler safety controls. <br />Q Check all boiler operating controls. <br />Q Check safety relief valves. <br />Q Check low water cut off. <br />Q Check all fuel line systems. <br />Q Check and tighten all electrical connections. <br />Q Check internal and external surfaces as required. <br />Q Check and dean burner assemblies as required. <br />Q Adjust burners for maximum efficiency. <br />Q Inspect water side. And change all gaskets with 12 month kits <br />CENTRIFUGAL CHILLERS <br />❑ Check evaporator and condenser pressures. <br />Q Inspect oil levels. <br />❑ Inspect oil filters. <br />❑ Perform oil analysis. <br />Q Perform oil analysis on each circuit <br />Q Check oil heater operations. <br />Q Leak test chiller with hot water. <br />Q Check condenser tubes. <br />Q Clean condenser tubes as required. <br />Q MEG compressor motor and oil pump motor. <br />Q Check refrigerant level. <br />Q Check main starter and contacts. <br />Q Check wiring and electrical connections. <br />Q Inspect and test all operating controls. <br />] Inspect and test all safety controls. <br />1 Review chiller logs and operation. <br />] Log operating conditions after unit stabilizes. <br />] Perform all factory recommended tasks. Service purge unit <br />MAINTENANCE <br />PROPOSAL <br />no <br />
The URL can be used to link to this page
Your browser does not support the video tag.