Laserfiche WebLink
APPENDIX A: SCOPE DETAILS <br />2 Indirect Gas Fired <br />Heating DX Cooling <br />Hot Gas Reheat <br />Energy Recovery <br />Wheel <br />Trane Horizon <br />Martin Luther King <br />Gym <br />New <br />M: Series OAGD210D3 <br />BOILERS <br />Check for proper boiler sequence. <br />Q Check piping, connections, valves for leaks. <br />Q Check boiler sections for leaks. <br />❑ Check water make-up system. <br />Ll Check room air intake system. <br />] Check all boiler safety controls. <br />Q Check all boiler operating controls. <br />] Check safety relief valves. <br />Check low water cut off. <br />] Check all fuel line systems. <br />:1 Check and tighten all electrical connections. <br />] Check internal and external surfaces as required. <br />Check and clean burner assemblies as required. <br />Adjust burners for maximum efficiency. <br />Inspect waterside. <br />MAINTENANCE <br />PROPOSAI <br />71 <br />