My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Marriott Hotel Site Development at Hall of Fame Phase I Proj No 116-021 - Majority Builders
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 3 - Marriott Hotel Site Development at Hall of Fame Phase I Proj No 116-021 - Majority Builders
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:51:28 PM
Creation date
11/23/2016 9:29:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
✓oha R19effchea <br />SEWER b EXrAdMN3 <br />CONTRACTOR <br />3305 NORTH HOME STREET <br />MISHAWAKA, INDIANA 46545 <br />PHONE: (574) 259-1418 <br />FAX: (574) 259-1417 <br />November 16, 2016 <br />Majority Builders, Inc. <br />Matt Flick <br />62900 U.S. 31 <br />South Bend, IN 46614 <br />Re: Marriott Project -Water Taps on Jefferson Blvd. <br />Thank you, for the opportunity to quote the above referenced project. All work per plans. Our scope of work and <br />projected associated costs are as follows: <br />Unit <br />TOTAL <br />Qty <br />Unit <br />Cost <br />Total <br />COST <br />* 6" 45 DEG FITTINGS <br />2 <br />EA <br />166.00 <br />$332.00 <br />* 6" FIELD LOCK GASKETS <br />4 <br />EA <br />115.00 <br />$460.00 <br />* 6" X 24" ANCH. COUPLING <br />1 <br />EA <br />133.00 <br />$133.00 <br />$925.00 <br />X 10% <br />92.5 <br />$1,017.50 <br />* ADDITIONAL SAWCUT <br />1 <br />EA <br />385.00 <br />$385.D0 <br />* ADDITIONAL ASPHALT REMOVAL 224.39 SFT <br />25 <br />SYD <br />$0.00 <br />* ADDITIONAL #53 REC CONCRETE 6" THICK <br />8 <br />TNS <br />8.50 <br />$69.96 <br />* ADDITIONA THRUST BLOCKS <br />2 <br />EA <br />40.70 <br />$81.40 <br />* INSERV VAC FOR UTILITIES <br />1 <br />EA <br />1,171.50 <br />$1,171.50 <br />* ADDITIONAL CURB REMOVAL <br />6 <br />EA <br />$0.00 <br />* FLOWABLE FILL FOR UNDER EXISTING UTILITIES <br />16 <br />CYD <br />78.93 <br />$1,262.88 <br />* EQUIPMENT, LABOR, O/T PREMIUM <br />1 <br />LS <br />9,082.50 <br />$9,082.50 <br />$12,053.24 <br />TOTAL <br />$13,070.74 <br />Exclusions: Materials and labor bonds, weather conditions, construction staking, materials testing, permit fees, utility assessments, tap fees <br />for water or sewer, removal of unforeseen buried debris or obstructions, dewatering, environmental remediation or issues, removal or <br />handling of any hazardous materials or site conditions; no asbestos abatement or remediation included. <br />*NOTE: Any discrepancy or clarification resolution as to the intent of this proposal and as to its meaning will be determined by Boettcher. <br />If you have any questions, please call. <br />in ere' <br />j <br />0 <br />hn B e cher <br />
The URL can be used to link to this page
Your browser does not support the video tag.