October 18, 2016 (REVISED Nov. 11) <br />Marriott Hotel Site Development Phase 1 <br />121 S. St. Joseph St <br />South Bend, IN <br />Change Order Proposal No. 3 <br />PROJECT# 2016-190 <br />1. Block out 27' x 48' area of concrete slab in kitchen area per architect directive at October 26 progress <br />meeting. <br />Deduct: $1,143.00 <br />2. As directed by architect, change elevator pit depth from 4'to 5'. Also required thickening the adjoining pier <br />footings P-1/F-9 by 12" in depth. This cost includes additional excavation, depth of 8" thick concrete <br />foundation wall, waterproofing, rebar, forming and concrete material. <br />Add: $1,851 <br />3. Reimbursement for water tap fees (two each 6" taps) obtained by Majority Builders, Inc. <br />Add: $5,137.00 <br />4. Install barricade fencing around pool. <br />Add: $228 <br />5. Reimbursement for Building Department plan review fee ($348) and foundation permit ($40) obtained by <br />Majority Builders, Inc. <br />Add: $388.00 <br />6. Delete manhole 101 (turn over to City of SB) and furnish temporary structure for storm drainage. <br />Add: $1,938.00 <br />7. Reimbursement for Building Department sewer permit obtained by Boettcher Excavating. <br />Add: $102.00 <br />Total of above... $8,501.00 <br />