Change Order No. 34 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />2. The table below lists the dates by which the identified roads shall be available to begin full <br />closure and the intermediate completion dates for full road closure. <br />Roadway <br />Starting Date for Full <br />Intermediate <br />Completion Date for <br />Closure <br />Full Road Closure <br />Intersection of Michigan Street and <br />June 6, 2016 <br />August 5, 2016 <br />Chippewa Avenue <br />Intersection of Michigan Street and <br />Mav 17, 2016 <br />September 7, 2016 <br />Bartlett Street <br />Intersection of Michigan Street and <br />May 17, 2016 <br />September 7, 2016 <br />Marion Street <br />a. The identified roads shall not be closed before the starting date and shall maintain a <br />minimum of two travel lanes prior to such date. <br />b. The work specified shall be arranged and prosecuted such that these roads are open <br />to traffic on or before the specified intermediate completion date. <br />3. The City, Engineer, and Contractor will hold a pre -construction meeting following award <br />of the contract. The date of the Notice to Proceed will be agreed upon at that meeting. <br />DRAWINGS: <br />The following sheets have been revised or issued as new sheets. <br />END OF CHANGE ORDER NO. 34 <br />OWNER: City of South Bend <br />Signature <br />Date <br />CONTRACTOR: Rieth-Riley Construction <br />Signature <br />//// 7 //% <br />Date <br />