Laserfiche WebLink
Change Order No. 34 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Street Conversion, Division B <br />Project No. 116-001 <br />SUBJECT: Saint Joe Street Time Extension <br />ISSUE DATE: November 7, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, <br />and be incorporated as an Addendum to the Contract. <br />SPECIFICATIONS: <br />The following special provisions have been amended or added to the Contract Documents and are <br />issued as a part of this Change Order: <br />XIV PROSECUTION AND PROGRESS <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Sec. 108 <br />B. Additions: <br />1. The project, both Division A and Division B, will have a completion date of June 1, 2017. <br />The contract time will start when the Notice to Proceed is delivered and signed. <br />2. The project will have intermediate completion dates as listed in the table below for roads <br />open to bi-directional traffic and traffic control devices shall be functioning at all <br />intersections on Saint Joe/Michigan with the exception of Washington, Jefferson <br />and South Street and on Main with the exception of Bronson. The intersections of <br />Saint Joe/ Michigan .-nd .lefferson, W-3hington and South along with Main and <br />Bronson will folio, This includes all travel and parking lane <br />asphalt and concrete work, structures, curb and permanent pavement markings complete <br />and in place. This wouk:i iJoseph <br />Street that could not be .,,arn _ �c r�s ,� _ �,, N .,.!, pie street <br />lighting on Saint Joe from Wayne to LaSalle needs to be functioning on the west <br />side of the street by December 16, 2016. With the east side being completed by the <br />December 25, 2016. <br />