Laserfiche WebLink
27 <br />SIDEWALK, CONCRETE, 4 INCH <br />765 <br />SYS <br />28 <br />PAVEMENT, CONCRETE, 8 INCH <br />90 <br />SYS <br />29 <br />CURB, CONCRETE <br />105 <br />LFT <br />3a, So <br />3, L4 ia. Sb <br />30 <br />CURB, CONCRETE, MODIFIED <br />123 <br />LFT <br />3.7. 6C <br />41, <br />31 <br />ONE-WAY PERPENDICULAR CURB <br />RAMP <br />16 <br />SYS <br />) , eb <br />d 4290, op <br />32 <br />DEPRESSED CORNER CURB RAMP <br />9 <br />SYS <br />33 <br />RETAINING WALL, CONCRETE <br />165 <br />LFT5c/,[>v <br />34 <br />PVC STORM SEWER PIPE, 27 IN <br />338 <br />LFT <br />Sx, p� <br />, y 57ln.on <br />35 <br />PVC STORM SEWER PIPE, 24 IN <br />347 <br />LFT <br />yb, oo <br />j3 9-'so, t>n <br />36 <br />PVC STORM SEWER PIPE, 12 IN <br />39 <br />LFT <br />'7. 00 <br />1, 0b3,o0 <br />37 <br />PVC SANITARY SEWER PIPE, 12IN <br />485 <br />LFT <br />ag,00 <br />/3,6ye. 00 <br />38 <br />PVC SANITARY SEWER PIPE, 8 IN <br />294 <br />LFT <br />�, 00 <br />v,'J&a. ex) <br />39 <br />SANITARY MANHOLE, 4-0 <br />3 <br />EACH <br />7 c'or . ' <br />prc,. e o <br />40 <br />STORM MANHOLE, 4'0 <br />2 <br />EACH <br />y eo", eD <br />y, oe)e, cc) <br />41 <br />STORM MANHOLE, 5'0 <br />3 <br />EACH <br />J fie, e c <br />d( S c eao <br />42 <br />CATCH BASIN, 5-0 <br />1 <br />EACH <br />78cn:oa <br />/,8cx.no <br />43 <br />SANITARY SADDLE MANHOLE, 4-0 <br />2 <br />EACH <br />7, 6ec),ocl <br />/S, eco. oa <br />44 <br />STORM SADDLE MANHOLE, 5'0 <br />1 <br />EACH <br />11moo, on <br />1,Soo, 00 <br />45 <br />CONNECT TO EXISTING STRUCTURE <br />3 <br />EACH <br />ceo. on <br />(o cco. 00 <br />46 <br />SODDING, NURSERY AND TOPSOIL <br />1,030 <br />SYS <br />�,p <br />p/,y8 ,op <br />47 <br />MULCHED SEEDING, AND TOPSOIL <br />4,840 <br />SYS <br />3 clo <br />/89c � yeo, oo <br />48 <br />MULCH RESTORATION <br />8 <br />CYS <br />CS, oo <br />ltoc. o0 <br />49 <br />IRRIGATION, REPAIR <br />1,030 <br />SYS <br />3,38 <br />13 78/ N0 <br />50 <br />LANDSCAPE EDGING, REPAIR <br />30 <br />LFT <br />Cj, ob 1 <br />-�.70, pp <br />51 <br />COPPER WIRE <br />305 <br />LFT <br />qsr <br />/,.37,?.60 <br />52 <br />CONDUIT, PVC, SCHEDULE 80, 2- DIA <br />305 <br />LFT <br />911. <br />d,S9a,w <br />TOTAL BID <br />Bidder (Firm): 5RP CONSTRUCTION IN <br />.19d, 5o0.00 <br />Address: 5777 Cleveland Road- P.O. Box 266 <br />City/State2ip: South Bend, IN 4663-6IephoneNumber: 271--7800 <br />B <br />(Signal e) <br />Matthew D. Cain, President <br />(Pdnled Name of Person Signing) <br />Version 10118/2016 Contractor's Bid for Public Works - 8 <br />