Laserfiche WebLink
In regard to the forty -five percent (45 %) water rate increase, Mr. Horvath assured the <br />Council that various meetings would occur with stakeholders and the Council to <br />determine what those prices would need to be in order to improve the Capital Fund to <br />meet the before mentioned capital needs. <br />Since the last rate increase, the Waterworks Department has reduced staff by sixteen (16) <br />positions and found ways to do more with less. Increases in administrative fees have <br />strained the department and are $1 million more than they were in 2006. Deferred <br />maintenance continues and will become a significant issue in the future if not addressed. <br />Our pumping capacity was about 70 million gallons of water a day, now that's at 40 <br />million because we have pumps and wells that we cannot run because they're dead. Peak <br />demand is about 26 million gallons a day, so we are still meeting our peaks but it can <br />become a future issue if we don't maintain equipment and assets. Pumpage has gone <br />down because we see a lot more people and businesses conserving water than used to. <br />We have money to replace equipment at Olive which is coming out of the Lost Recovery <br />Fund which a special fund set up for that purpose. <br />We have $960,000 budgeted for meter replacement. Meters have a useful lifespan of two <br />(2) years, and we're losing a lot of revenue to replace meters that freeze up or <br />malfunction, so we're budgeting for a Meter Replacement Program. The department is <br />also looking into updating software which causes problems in the billing office. The <br />Wastewater and Organic Resources facility processes 48 million gallons per day with a <br />peak 70 million gallons, and processes over 11 billion gallons of wastewater per year. <br />Fifty percent (50 %) of our sewer system is a CSO system. <br />We also renovated an old 1956 digester and fitted it with a moving cover roof that <br />collects natural gas which will power boilers, but will also be used for our CNG fleet. We <br />have four (4) digesters and we've only renovated one (1). We're currently operating with <br />one (1) digester and a back -up. Primary clarifiers were also built in 1956 and need <br />updating and automation in order to be controlled remotely. <br />On the wastewater side, we have 39 million in expenses which has gone up from 37.5 <br />million in 2016. The increase is mainly attributed to pay in lieu of taxes, and debt service <br />payments from the debt we've taken on from sewer bonds. The full wastewater budget <br />has an increase in revenue because the Ethanol Plant is producing more waste than <br />originally projected. The requested amount is 32 million for wastewater which asks for 4 <br />million in capital to continue the clarifier project, and work on wastewater stations. The <br />department also intends to start a check valve program which is a cost -share program for <br />people who have back -ups in basements from combined sewers. The department is also <br />working hard to implement a long -term program to save on the cost - share. The only way <br />to eliminate the problem is to completely separate the CSO system which is a billion <br />dollar program. Since the City can't afford a billion dollars, we went forward with the <br />consent decree to look at some other options which have been put on hold since it would <br />raise the rates to a degree that we're not comfortable with. In lieu of doing a billion dollar <br />program, this program will hopefully help residents mitigate the problem. <br />10 <br />