My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Berlin Place Site Development - Indiana Earth, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - Berlin Place Site Development - Indiana Earth, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:30:40 PM
Creation date
11/17/2016 3:14:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o�SouTlt'g <br />o <br />ti 'vim-- z <br />U - <br />[y: <br />ADDENDUM NO. I az <br />To the Contract Document and Project Specifications for the 1865 ' <br />BERLIN PLACE SITE DEVELOPMENT <br />116-089 <br />CITY OF SOUTH BEND, INDIANA <br />Date: November 14, 2016 <br />To: All holders of the contract document for the above project <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected and the remainder of the original contract document is to remain in its <br />entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 —CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART 1 - CLARIFICATIONS <br />1.01. Attached is the sign -in sheet, agenda and meeting notes from the Pre -bid meeting held on <br />November 8, 2016. <br />1.02. The City of South Bend has scheduled project award for Tuesday, November 22, 2016. <br />PART 2 — SPECIAL PROVISIONS <br />2.01 SPECIAL PROVISIONS, Page 4, Section XHI, Prosecution and Progress, Section B, Item 3: <br />I. REVISE: Final completion of the project shall be May 1, 2017. <br />2.02 SPECIAL PROVISIONS, Page 25, Section XLVII , Structure Backfill <br />I. ADD: Structure Backfill shall be used as trench backfill to the top of the storm or sanitary <br />sewer pipe. The remainder of the trench shall be backfilled with INDOT B-Borrow <br />granular fill material, or an approved equal. INDOT B-Borrow, or an approved equal, shall <br />be used as backfill in excavations for Pipe Removal, Structure Removal and Existing <br />Foundation, Debris Removal and Replacement, full depth. <br />2. ADD: B-Borrow will be paid for at the contract unit price for "B-Borrow.... CYS" as <br />indicated on the itemized proposal sheet. <br />2.03 SPECIAL PROVISIONS, Page 17, Section XXXVI, Removal of Concrete Sidewalk, Curb <br />Ramps and Approaches <br />A. Items B, No. 1 <br />Berlin Place Site Development (116-089) Addendum # I <br />November 14, 2016 page I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.