Laserfiche WebLink
27 <br />SIDEWALK, CONCRETE, 4INCH <br />765 <br />SYS,�g.bpq <br />pgo.cx, <br />28 <br />PAVEMENT, CONCRETE, a INCH <br />90 <br />SYS <br />29 <br />CURB, CONCRETE <br />105 <br />LFT <br />,6o <br />3,Ll Sb <br />30 <br />CURB, CONCRETE, MODIFIED <br />123 <br />LFT <br />3,7. 50 <br />f/, (v/.� • so, <br />31 <br />ONE-WAY PERPENDICULAR CURB <br />RAMP <br />16 <br />SYS <br />)t�.0o <br />�,(oye.o2 <br />32 <br />DEPRESSED CORNER CURB RAMP <br />9 <br />SYS <br />lbS.00 <br />33 <br />RETAINING WALL, CONCRETE <br />165 <br />LFT <br />I �5y,po <br />y/'Cq/0.0c: <br />34 <br />PVC STORM SEWER PIPE, 27 IN <br />336 <br />LFT <br />� . oo <br />r-/ 5 76,, <br />35 <br />PVC STORM SEWER PIPE, 24 IN <br />347 <br />LFT <br />y0, 00 <br />/ 3 ggo, c)o <br />36 <br />PVC STORM SEWER PIPE, 12 IN <br />39 <br />LFT <br />7.00 <br />1,US3,n0 <br />37 <br />PVC SANITARY SEWER PIPE, 12 IN <br />485 <br />LFT <br />a8.c�n <br />i3,5fs'z,.nn <br />38 <br />PVC SANITARY SEWER PIPE, 8 IN <br />294 <br />LFT <br />a3. 00 <br />v, 7Cod, tx <br />39 <br />SANITARY MANHOLE, 4'0 <br />3 <br />EACH <br />7Ccc . •-' <br />j is t>c t,. .t <br />40 <br />STORM MANHOLE, 4'0 <br />2 <br />EACH <br />y ppp, oa <br />y, Onr. cc, <br />41 <br />STORM MANHOLE, 5'0 <br />3 <br />EACH <br />42 <br />CATCH BASIN, 5-0 <br />1 <br />EACH <br />7,gcn:co <br />7,8tx•c , <br />43 <br />SANITARY SADDLE MANHOLE, 4-0 <br />2 <br />EACH <br />sco,on <br />15 oco. on <br />44 <br />STORM SADDLE MANHOLE, 5'0 <br />1 <br />EACH <br />ry pp, en <br />7,50b. 00 <br />45 <br />CONNECT TO EXISTING STRUCTURE <br />3 <br />EACH <br />o6P. 00 <br />('p, Oeo. 00 <br />46 <br />SODDING, NURSERY AND TOPSOIL <br />1,030 <br />SYS <br />q,SO <br />no <br />47 <br />MULCHED SEEDING, AND TOPSOIL <br />4,840 <br />SYS <br />3 CIO <br />4B <br />MULCH RESTORATION <br />8 <br />CYS <br />/-5, 00 <br />49 <br />IRRIGATION, REPAIR <br />1,030 <br />SYS <br />3. 38 <br />13 ry8l. cl0 <br />50 <br />LANDSCAPE EDGING, REPAIR <br />30 <br />LFT <br />�j. cc <br />51 <br />COPPER WIRE <br />305 <br />LFT <br />C/,So <br />52 <br />CONDUIT, PVC, SCHEDULE 60,0 DIA <br />305 <br />LFT <br />TOTAL BID <br />'190, san.00 <br />Bidder(Firm): HRP CONSTRUCTION INC. <br />Address: 5777 Cleveland Road, P.O. Box 2QU <br />City/State/Zip: South Bend, IN 46634-lephon <br />(Printed Name of Person Signing) <br />Version 10/18/2016 Contractors Bid for Public Works - 8 <br />