My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/28/76 Board of Public Works Special Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1976
>
10/28/76 Board of Public Works Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:39:12 PM
Creation date
11/17/2016 12:29:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/28/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br />SPECIAL MEETING <br />OCTOBER 23, 1976 <br />A special meeting of the Board of Public Works was convened <br />at 8:55 a.m, on Thursday, October 28, 1976 by President Rollin <br />E. Farrand, with Mr. Farrand, Mr. Brunner and Mr. Mullen present. <br />Mr. Farrand explained that the purpose of the special meeting was <br />to open proposals received for the curb and sidewalk reconstruction <br />on Kaley Street in the two blocks just south of Western Avenue. <br />The following proposals were opened and read: <br />Ba.tteaat Construction Company <br />Remove existing curbing - $1.60/L.F. <br />New curbing, incl. backfilling and sodding - $7.90L.F.. <br />Remove and replace existing Sidewalk - $1.80/S.F. <br />Ziolkowski Construction Company <br />4" concrete walks - Unit price, $1.50 per square foot <br />Concrete curb - Unit price $8.65 per lineal foot <br />6" concrete approach Unit rice $1.60 per square foot <br />Landscaping - Unit price of .00 per square yard <br />McIntyre and Jones Construction Company <br />Curb Removal - $.90 per linear foot <br />Construct curb - $7.25 per linear foot <br />4" sidewalk removed and replaced - $16.20 per square yard <br />Seeding - $.90 per square yard <br />Rieth-Riley Construction Comnan <br />Curb Removal - $1.00 ft. <br />Walk Removal - $1.00/sy <br />Drive Removal - $1.00/sy <br />6" x 16" curb - $ 5.7 5 / 1f t . <br />4" concrete walk.- $10.50/sy <br />6" concrete drive pavement - $12.50/sy. <br />Backfill & Seed - $1,500. <br />Total approximate cost - $10,625.00 <br />Mr. Farrand made a motion that the proposals be referred to the <br />Department of Engineering for the preparation of a bid tabulation <br />and report to the Board on November 1, 1976. Mr. Brunner seconded <br />the motion and it carried. <br />Upon motion made by Mr. Farrand, seconded by Mr. Mullen and carried, <br />the special meeting adjourned at 9:00 a.m. <br />ATT ST: <br />Patricia DeC ercq, Cler <br />1-2 Z) <br />I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.