Laserfiche WebLink
NIC 0 <br />V) <br />LU <br />O <br />0 <br />U-1 <br />Q <br />V <br />V) <br />I- <br />V) <br />O <br />V <br />a. <br />Q <br />V <br />Enginaarinn <br />and E <br />13' <br />Right of Way <br />and Land Acquisition <br />7% <br />* Contingencies are part of the FTA Cost Categories Template <br />and reflect the level of detail known at the time of the 2009 <br />feasibility study. <br />Project Capital Cost: <br />• $571 million (to Dyer) <br />Proposed Cost Distribution: <br />• 50% of capital costs paid with federal funds <br />• 50% of capital cost is allocated to local sources (Lake <br />County) <br />8 page <br />FIGURE 4 <br />Conceptual Alignment for the West lake <br />Corridor <br />1 a_ ICI <br />S <br />