My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher - Inspect and Prepare Construction Drawings for Repair of South Bend Dam
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lawson Fisher - Inspect and Prepare Construction Drawings for Repair of South Bend Dam
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:01:41 AM
Creation date
11/9/2016 1:55:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. LFA will prepare Schematic drawings for the repair of the stoplogs. The <br />repair will be proposed after having evaluated various options. <br />3. After City approval of the Schematic Drawings, LFA will prepare <br />construction drawings and specifications for the repair of the stoplogs. It is <br />assumed that field survey data will not be required and the existing plans <br />will provide the necessary data for preparing the plans and specifications <br />for the repair. The plans and specifications will be provided to the City in <br />PDF format. <br />Schedule <br />This project can be completed within sixty (60) days following the Notice to Proceed. <br />Appendix 2, Scope of Work <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright C2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.