My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Christopher Burke Engineering - South Bend Dam Capital Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Christopher Burke Engineering - South Bend Dam Capital Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:11:10 PM
Creation date
11/9/2016 1:53:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDCi==- <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of November 8.2016 ("Effective Date") between <br />Board of Public Works. City of South Bend Indiana ("Owner") and <br />Christopher B. Burke Engineering LLC ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />116-095: South Bend Dam Capital Improvement Plan ("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />Engineer will prepare a capital improvement plan for the South Bend Dam. Engineer will rely on <br />information, reports, and records provided by Owner as well as limited field observations to develop an <br />itemized list of major items related to the dam that are expected to require maintenance, repair, or <br />replacement within the next fifty years. The intent of the capital improvement plan is to develop an opinion <br />of probable cost for fixture work associated with the dam that can be used in lease negotiations between the <br />Owner and a third party. Tasks to be completed by Engineer in support of this project include: <br />1. Site visit by Engineer's personnel with expertise in dam safety, civil engineering, structural <br />engineering, and/or mechanical/electrical engineering; <br />2. Review of files provided by Owner; <br />3. Review of files obtained from the Indiana Department of Natural Resources; <br />4. Review of files obtained from FERC docket(s); <br />5. Evaluation of operation, maintenance and repair costs for components of dam; <br />6. Preparation of summary report; and <br />7. Attendance at up to two (2) meetings with Owner. <br />Owner and Engineer further agree as follows: <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.