My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:23:02 PM
Creation date
11/9/2016 10:26:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Division G - Wilber from Siblev to Fassnacht <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />150 <br />SY <br />$65.00 <br />$9,750.00 <br />2 <br />PAIRED PERPENDICULAR CURB RAMP <br />9 <br />SY <br />$450.00 <br />$4,050.00 <br />3 <br />CONCRETE APPROACH, 6-INCH <br />14 <br />SY <br />$225.00 <br />$3,150.00 <br />4 <br />B BORROW <br />15 <br />CY <br />$85.00 <br />$1,275.00 <br />6 <br />GRADING, TOPSOIL, AND SODDING <br />45 <br />SY <br />$60.00 <br />$2,700.00 <br />Division G Base Bid Total $20,925.00 <br />Division H - Wilber from Fassnacht to Lonelev <br />Item <br />No <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />143 <br />SY <br />$65.00 <br />$9,295.00 <br />2 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />7 <br />SY <br />$535.00 <br />$3,745.00 <br />3 <br />DEPRESSED CORNER CURB RAMP <br />10 <br />SY <br />$535.00 <br />$5,350.00 <br />4 <br />CONCRETE APPROACH, 6-INCH <br />14 <br />SY <br />$225.00 <br />$3,150.00 <br />5 <br />B BORROW <br />14 <br />CY <br />$85.00 <br />$1,190.00 <br />7 1 <br />GRADING, TOPSOIL, AND SODDING <br />43 <br />SY <br />$60,00 <br />$2,580.00 <br />Division H Base Bid Total $25,310.00 <br />Division I - Woodward Ave. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />142 <br />SY <br />$94.00 <br />$13,348.00 <br />2 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />9 <br />SY <br />$440.00 <br />$3,960.00 <br />3 <br />CONCRETE APPROACH, 6-INCH <br />27 <br />SY <br />$215.00 <br />$5,805.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />365 <br />LF <br />$73.00 <br />$26,645.00 <br />5 <br />B BORROW <br />20 <br />CY <br />$75.00 <br />$1,500.00 <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />134 <br />SY <br />$41.50 <br />$5,561.00 <br />Division I Base Bid Total $56,819.00 <br />Alternate #1 - Division I <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />100 <br />SY <br />$94.00 <br />$9,400.00 <br />6 <br />B BORROW <br />14 <br />CY <br />$65.00 <br />$910.00 <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />100 <br />SY <br />$52.00 <br />$5,200.00 <br />Division I Alternate #1 Total $15,510.00 <br />Division I Base Bid + Alternate #1 Total $72,329.00 <br />Version 7/28/2016 Contractor's Bid for Public Works - 8 Bidder's Name: Walsh Kelly, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.