Laserfiche WebLink
(i) Full Sun: Kentucky Bluegrass, a minimum of 3 cultivars. <br />6. Sod shall be watered immediately after laying, once every day for the first week after <br />laying, once every second day of the second week after laying, once every third day of <br />the third and fourth weeks after laying. Sod shall only be accepted after it has been <br />properly maintained for four (4) weeks after laying. <br />7. Payment shall be made at the Unit Price as specified in the Proposal as follows: <br />GRADING, TOPSOIL, AND SODDING .......... SY <br />XXXII. CONCRETE CURB, MODIFIED <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 604 <br />B. Additions: <br />1. The line item CONCRETE CURB, MODIFIED, shall include removing the existing curb <br />and installing new curb in accordance with the special provisions herein. <br />2. Length of removal limits shall be coordinated with the City. The cost of removal and <br />hauling of materials offsite shall not be paid for separately, but included in the cost of <br />concrete curb. <br />3. Concrete or other items outside the removal limits damaged by the Contractor or any <br />subcontractors during the removal process will be repaired or replaced to the satisfaction <br />of the Engineer at no additional cost. <br />4. Saw cuts required for removal shall not be paid for separately, but included in the cost of <br />the removal items. <br />5. The Concrete Curb type shall be a "Modified Combination Curb" per the City of South <br />Bend Standards, Sheet SC-1, except that the pavement patch shall match the existing <br />street material whether it be asphalt, concrete, or asphalt over concrete. The minimum <br />asphalt thickness shall be 7 inches and the minimum concrete thickness shall be 6 <br />inches, or match the existing thickness whichever is greater. In the case of asphalt over <br />the concrete pavement, the minimum concrete thickness shall be 6 inches and the <br />asphalt thickness shall match the existing. Removal and replacement of existing <br />pavement shall not be paid for separately, but included in the cost of the CONCRETE <br />CURB, MODIFIED item. <br />6. Expansion material is required at all cold joints and every 80 ft. <br />7. Control joints are to be placed at equal intervals not exceeding 10 ft. <br />8. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />Concrete Curb, Modified ................... LF <br />Version 4/07/2015 Special Provisions -4 <br />