Laserfiche WebLink
2016 Curb and Sidewalk Construction Phase II <br />PROJECT NO.116-029A <br />ADDENDUM NO. 1 <br />Date: October 24, 2016 <br />To: All Plan Holders <br />From: Patrick C. Kerr, PhD, P.E. eA#11� <br />You must acknowledge receipt of this addendum by signing the first page and <br />returning a copy with your bid. <br />The following information highlights the changes to the contract documents and <br />exhibits: <br />1. Division I, which includes curb and sidewalk replacement on <br />1000 Block of Woodward Ave. in South Bend, will be added to <br />scope of the project. Division I includes a base bid and one <br />alternate <br />2. Sections XXV, XXVIII, and XXIX will be replaced in the <br />Provisions with revised versions <br />3. Section XXXII will be added to the Special Provisions <br />4. Bid Tabs for Division I will be added to the Contractor's <br />Public Work <br />5. Exhibit 4 will be added to the project exhibit package <br />the <br />the <br />(1) <br />Special <br />Bid for <br />The following shall be replaced, amended, or added to the special provisions. <br />XXV. CONCRETE SIDEWALK, 4-INCH <br />S. Additions: <br />11. In Division I, contractor shall coordinate tie-ins with engineer prior to pouring concrete <br />against existing steps in front of properties 1005 Woodward, 1023 Woodward, and 1027 <br />Woodward. Concrete used to match/transition sidewalk with existing steps shall not be <br />paid for separately but shall be included in the cost of the concrete sidewalk. <br />12. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />CONCRETE SIDEWALK, 4-INCH...... ......... .SY <br />Version 4/07/2015 Special Provisions -2 <br />