My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Premium Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Opening of Bids - 2016 Curb & Sidewalk Construction Phase II - Premium Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:20:55 PM
Creation date
11/9/2016 10:23:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Division G - Wilber from Sibley to Fassnacht <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />150 <br />SY <br />V J_7 <br />19 t SL.cc <br />2 <br />PAIRED PERPENDICULAR CURB RAMP <br />9 <br />SY <br />.211 b: •oc, <br />a; G &11.CID <br />3 <br />CONCRETE APPROACH, 6-INCH <br />14 <br />SY <br />�255.cv <br />3 576.cb <br />4 <br />B BORROW <br />15 <br />CY <br />4 S. r•o <br />9 -I a ,ec <br />6 <br />GRADING, TOPSOIL, AND SODDING <br />45 <br />SY <br />1C9.c,0 <br />6; scj,op <br />Division G Base Bid Total 3 9155 41. oo <br />Division H - Wilber from Fassnacht to Longley <br />Item <br />No <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />143 <br />SY <br />I3 5 , ec <br />i 9 3Q 5,cc, <br />2 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />7 <br />SY <br />2 (ol'1 .00 <br />3 <br />DEPRESSED CORNER CURB RAMP <br />10 <br />SY <br />& ko-eo <br />4 <br />CONCRETE APPROACH, 6-INCH <br />14 <br />SY <br />aS4.06 <br />3.5s,6.c <br />5 <br />BBORROW <br />14 <br />CY <br />65,e <br />7 1 <br />GRADING, TOPSOIL, AND SODDING <br />43 <br />SY <br />I y S,C^t <br />C� 'a3S,cC <br />Division H Base Bid Total 91 -36, a (A .c x> <br />Division I — Woodward Ave. <br />Item <br />No <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />142 <br />SY <br />117, oo <br />(K/ 111, .cb <br />2 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />9 <br />SY <br />Vox'c- <br />1 9 $Qxy> <br />4 <br />CONCRETE APPROACH, 6-INCH <br />27 <br />SY <br />QO.", <br />5 <br />CONCRETE CURB, MODIFIED <br />365 <br />LF <br />60-0 ,+ <br />I ) 010,00 <br />6 <br />B BORROW <br />20 <br />CY <br />$, cC <br />1360.ro <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />134 <br />SY <br />SQ,r`O <br />Division I Base Bid Total $ 51, I C11A.0 D <br />Alternate #1 — Division I <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, 4-INCH <br />100 <br />SY <br />j Q! j,�r,jO,OCO.tC <br />6 <br />B BORROW <br />14 <br />CY <br />7 <br />GRADING, TOPSOIL, AND SODDING <br />100 <br />SY <br />Cxn- <br />Division I Alternate #1 Total 19, GlLn,00 <br />Division 1 Base Bid + Alternate #1 Total # 70,70A.no <br />Version 7/28/2016 Contractor's Bid for Public Works - 8 Bidder's Name: w:,. Cb`^c-'r`C�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.