My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 10 - Ignition Park Infrastructure Phase 1C Division A - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 10 - Ignition Park Infrastructure Phase 1C Division A - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:49:07 PM
Creation date
11/9/2016 10:15:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 114-063A <br />Change Order No. 10-11/1/16 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Patrick C. Kerr, PhD., P.E. <br />Professional Engineer No. 10707546 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />PROJECT: Ignition Park Infrastructure — Phase 1 C (Division A) <br />Project No. 114-063A <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: November 1, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item Qty <br />1. Weather Fixes 1 <br />2. Sign Landscaping 3 <br />3. Sign Relocation 1 <br />1. Weather Fixes <br />Unit Price <br />Total <br />LS $14,000.00 <br />$14,000.00 <br />EA $1,450.00 <br />$4,350.00 <br />LS $11,000.00 <br />$11,000.00 <br />Repair excessive erosion damage and trees that are dead or in poor health due to the <br />severe storm in August 2016. Work areas include the basin on the SW corner and sidewalks <br />areas along Sample St. and Ignition Dr. <br />2. Sign Landscaping <br />Place edging and river rock around the Ignition Park signs located at the intersections of <br />Sample St. and Franklin St.; Franklin St. and Stull St.; and Prairie Ave. and Cotter St. This work <br />is to protect the signs from lawnmower damage. <br />3. Sign Relocation <br />Relocate the Ignition Park sign located at Franklin St. and Stull St. about 10-15 ft to the <br />southeast. Original setback requirements don't allow for good visibility, but movement closer to <br />the sidewalk corner will alleviate the problem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.