Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:57:02 PM
Creation date
11/9/2016 10:14:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUBCONTRACTORS 109.04 M <br />WEEK ENDING: September 20, 2016 <br />DESCRIPTION AMOUNT <br />Pemberton Davis Electric $1,732.12 <br />TOTAL SUBCONTRACT WEEK ENDING $1,732.12 (29) <br />10 % x LINE (30) $3,000.00 OR LESS $173.21 (31) <br />7 %x LINE (30) OVER $3,000.00 $0.00 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) $1.905.33 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17), (22), (28) & (33) <br />1 1 % OF BOND RATE BASED UPON LINE (34) <br />10 % x LINE (35) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) <br />$1,905.33 (34) <br />$20.96 (35) <br />$2.10 (36) <br />$1,928.39 (37) <br />Page 3 of 3 <br />