Laserfiche WebLink
Change Order No. 31 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: <br />City of South Bend <br />ENGINEER: <br />American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: <br />Rieth-Riley Construction <br />PROJECT: <br />South Bend One -Way to Two -Way Conversion Division B <br />Project No. 116-001 <br />SUBJECT: <br />Saw Cut Bike Path Joints <br />ISSUE DATE: <br />October 3, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. A pay item is being added to account for the work of saw cutting joints within the <br />PCCP bike path. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS• <br />1. Bid/Proposal Form: <br />Division B: <br />Add EWA Line Item No. 472: SAW CUT BIKE PATH JOINTS, 2,000 LFT @ $2.00/LFT <br />for a total addition of $4,000.00. <br />SPECIFICATIONS: <br />None <br />DRAWINGS: <br />None <br />END OF CHANGE ORDER NO. 31 <br />Sheet 1 of 3 <br />