Laserfiche WebLink
Change Order No. 29 <br />One- Way to Two -Way Street Conversion <br />Division A & B <br />Project No. 116-001 <br />OWNER: <br />City of South Bend <br />ENGINEER: <br />American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: <br />Rieth-Riley Construction <br />PROJECT: <br />South Bend One -Way to Two -Way Conversion Division A & B <br />Project No. 116-001 <br />SUBJECT: <br />Signing Changes <br />ISSUE DATE: <br />October 12, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Revise posted speed limits south of Bronson Street from 25mph to 30mph <br />2. Add NO RIGHT TURN ON RED signing along St Joseph Street <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1. Bid/Proposal Form: <br />Division A: <br />Add 65 SF to Line Item No.131 SIGN, SHEET, WITH LEGEND 0.080 @ $14.00/SFT <br />for a total addition of $910.00. <br />Division B: <br />Add 40 SFT to Line Item No.232 SIGN, SHEET, WITH LEGEND 0.080 @ $12.50/SFT <br />for a total addition of $500.00. <br />Sheet 1 of 3 <br />