Laserfiche WebLink
City of South Bend Project No. 115-103 <br />Change Order No. 2 - 08/18/16 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Patrick C. Kerr, PhD., P.E. <br />Professional Engineer No. 10707546 <br />CONTRACTOR: Poblocki Sign Company <br />PROJECT: Ignition Park Identity Signage <br />Project No. 115-103 <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: August 18, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item Qty Unit Price Total <br />1. Acrylic Backer 1 LS $5,834 $5,834 <br />A 1" acrylic backing will be added to the back of each letter on all five signs to prevent the <br />lighting from reflecting too harshly against the metal sign backing. The acrylic will provide a <br />much cleaner look to the signs. <br />The following sections of the Contract Documents are added as a result of the above changes: <br />SPECIFICATIONS <br />XVIII. Acrylic Backer <br />A. Prevailing Specifications: 2014, INDOT Standard Specifications Section 105 <br />B. Additions: <br />1. All lettering shall receive a 1" acrylic backing. <br />2. Acrylic backer will be paid as a lump sum. <br />