Laserfiche WebLink
5. For customers with greater than 20 ERUs as calculated pursuant to <br />subsection 4. of this Section, the ERU shall be adjusted based upon the Peaking Factor <br />as computed herein. The Peaking Factor shall be calculated by dividing the Peak <br />Daily Flow by the Average Daily Flow, both as reported in the sewer capacity <br />certification. In no event will a Peaking Factor less than 2.0 be used for purposes of <br />the adjustment described in this Subsection. The Peaking Factor divided by 4.0 (the <br />Peaking Factor for residential connections) will be multiplied by the number of ERUs <br />for purposes of computing the system development charge owed by the customer. The <br />City Board of Works may execute a contract with the customer authorizing an <br />increase to the initial System Development Charge based upon actual usage data that <br />is collected after connection. <br />6. Where a prospective customer seeks to connect a new structure on <br />property which replaces a prior structure of a similar use what was located on the <br />same property and which was connected to the South Bend Municipal Sewer Works, <br />no system development charge will be collected. For instance, if the prior structure <br />was a single family structure and the new structure is to be used as a multi - family <br />structure, a system development charge, as contemplated herein this Ordinance, shall <br />be charged. The Board of Public Works shall make the final determination of whether <br />the new property structure is a similar use to the prior property structure for the <br />purposes of this subsection. <br />Section 2. Section 17 -80 of the City Code shall be repealed in its entirety and amended <br />to read as follows: <br />Sec. 17 -80. Water line outside City limits; assessment E) f i sta4 atio,, , har-R�System <br />Development Charge for Water inside and outside City limits. <br />VON <br />.. .. <br />:. <br />