Laserfiche WebLink
12 <br />REGULAR MEETING <br />FEBRUARY 27, 1984 <br />RIETH-RILEY CONSTRUCTION CO. <br />P.O. Box 1775 <br />South Bend, Indiana 46634 <br />HAC Surface-#ll Limestone <br />HAC Surface-#ll B.F. Slag <br />HAC Surface7#11 B.O.F. Slag <br />HAC Binder #8 or #9 <br />HAC Binder #11 <br />HAC Base #53B <br />Bit. Patch Material <br />KOCH ASPHALT COMPANY <br />DIVISION OF KOCH FUELS <br />1510 Clover Road <br />Bituminous Material -Tack <br />Bit. Mat. -Crack Pouring <br />Bit. Mat. -Road Oil <br />Emulsified Asphalt <br />THE LEVY COMPANY, INC. <br />P.O. Box 540 <br />Portage, Indiana 46368 <br />Min. Agg. #2 Stone or Slag <br />Coarse Agg. #73 Stone or Slag <br />Coarse Agg.-Crusher Run <br />ST. JOSEPH MATERIALS CO., INC. <br />60669 Orange Road <br />South Bend, Indiana 46614 <br />Coarse Aggregate #9 Spec. <br />Coarse Agg. #73 Gravel <br />Fine Agg. #14-1 or #14-2 <br />BITUMINOUS MATERIALS CO., INC <br />2720 East Durbin Road <br />P.O. Box 1295 <br />Warsaw, Indiana 46580 <br />Bituminous Material -Tack <br />Bit. Mat. -Crack Pouring <br />Bit. Mat. -Road Oil <br />Emulsified Asphalt <br />Alternate: SS-1 or SS-1H <br />Alternate: AE-90S <br />Bid was signed by Chester L. Skwarcan, <br />Manager, Indiana Division, Non - <br />Collusion Affidavit was in order <br />and a 10% Bid Bond was submitted. <br />$22.00/ton <br />$550,000.00 <br />$23.75/ton <br />$593,750.00, <br />$23.30/ton <br />$116,500.00 <br />$17.70/ton <br />$177,000.00 <br />$17.85/ton <br />$ 89,250.00' <br />$17.40/ton <br />$ 87,000.00 <br />,25.35/ton <br />$ 25,350.00 <br />TOTAL: $1,638,850.00 <br />Bid was signed by L.F. Fitz, General <br />Manager, Non -Collusion Affidavit was <br />in order and a 10% Bid Bond was <br />submitted. <br />$128.52/ton <br />.6447/gal. <br />.2847/gal. <br />.6447/gal. <br />TOTAL <br />$ 19,278.00 <br />$ 25,788.00 <br />$ 49,822.00 <br />$386,820.00 <br />$481,708.00 <br />Bid was signed by Donald J. Rapley, <br />Manager Transportation/Sales <br />Coordinator, Non -Collusion Affidavit <br />was in order and a 10% Bid Bond <br />was submitted. <br />$ 6.50/ton $ 97,500.00 <br />$ 6.50/ton $ 32,500.00 <br />$ 6.25/ton $ 12,500.00 <br />TOTAL: $142,500.00 <br />Bid was signed by Donald J. Rapley, <br />Manager Transportation/Sales <br />Coordinator, Non -Collusion Affidavit <br />was in order and a 10% Bid Bond <br />was submitted. <br />$ 3.25/ton <br />$ <br />26,000.00 <br />$ 2.85/ton <br />$ <br />14,250.00 <br />$ 2.25/ton <br />$ <br />4,500.00 <br />TOTAL: <br />$ <br />44,750.00 <br />Bid was signed by G.W. Clark, Vice <br />President and Secretary -Treasurer, <br />Non -Collusion Affidavit was in <br />order and a Contractor's Bond for <br />supplies in the amount of <br />$70,000.00 was submitted. <br />$150.00/ton <br />.69/gal. <br />.44/gal. <br />.69/gal. <br />.68/gal. <br />.94/gal. <br />TOTAL: <br />$ 23,400.00 <br />$ 27,600.00 <br />$ 77,000.00 <br />$414,000.00 <br />$408,000.00 <br />$564,000.00 <br />$542,000.00 <br />1 <br />1 <br />1 <br />