<br />REGULAR MEETING
<br />FEBRUARY 27, 1984
<br />RIETH-RILEY CONSTRUCTION CO.
<br />P.O. Box 1775
<br />South Bend, Indiana 46634
<br />HAC Surface-#ll Limestone
<br />HAC Surface-#ll B.F. Slag
<br />HAC Surface7#11 B.O.F. Slag
<br />HAC Binder #8 or #9
<br />HAC Binder #11
<br />HAC Base #53B
<br />Bit. Patch Material
<br />KOCH ASPHALT COMPANY
<br />DIVISION OF KOCH FUELS
<br />1510 Clover Road
<br />Bituminous Material -Tack
<br />Bit. Mat. -Crack Pouring
<br />Bit. Mat. -Road Oil
<br />Emulsified Asphalt
<br />THE LEVY COMPANY, INC.
<br />P.O. Box 540
<br />Portage, Indiana 46368
<br />Min. Agg. #2 Stone or Slag
<br />Coarse Agg. #73 Stone or Slag
<br />Coarse Agg.-Crusher Run
<br />ST. JOSEPH MATERIALS CO., INC.
<br />60669 Orange Road
<br />South Bend, Indiana 46614
<br />Coarse Aggregate #9 Spec.
<br />Coarse Agg. #73 Gravel
<br />Fine Agg. #14-1 or #14-2
<br />BITUMINOUS MATERIALS CO., INC
<br />2720 East Durbin Road
<br />P.O. Box 1295
<br />Warsaw, Indiana 46580
<br />Bituminous Material -Tack
<br />Bit. Mat. -Crack Pouring
<br />Bit. Mat. -Road Oil
<br />Emulsified Asphalt
<br />Alternate: SS-1 or SS-1H
<br />Alternate: AE-90S
<br />Bid was signed by Chester L. Skwarcan,
<br />Manager, Indiana Division, Non -
<br />Collusion Affidavit was in order
<br />and a 10% Bid Bond was submitted.
<br />$22.00/ton
<br />$550,000.00
<br />$23.75/ton
<br />$593,750.00,
<br />$23.30/ton
<br />$116,500.00
<br />$17.70/ton
<br />$177,000.00
<br />$17.85/ton
<br />$ 89,250.00'
<br />$17.40/ton
<br />$ 87,000.00
<br />,25.35/ton
<br />$ 25,350.00
<br />TOTAL: $1,638,850.00
<br />Bid was signed by L.F. Fitz, General
<br />Manager, Non -Collusion Affidavit was
<br />in order and a 10% Bid Bond was
<br />submitted.
<br />$128.52/ton
<br />.6447/gal.
<br />.2847/gal.
<br />.6447/gal.
<br />TOTAL
<br />$ 19,278.00
<br />$ 25,788.00
<br />$ 49,822.00
<br />$386,820.00
<br />$481,708.00
<br />Bid was signed by Donald J. Rapley,
<br />Manager Transportation/Sales
<br />Coordinator, Non -Collusion Affidavit
<br />was in order and a 10% Bid Bond
<br />was submitted.
<br />$ 6.50/ton $ 97,500.00
<br />$ 6.50/ton $ 32,500.00
<br />$ 6.25/ton $ 12,500.00
<br />TOTAL: $142,500.00
<br />Bid was signed by Donald J. Rapley,
<br />Manager Transportation/Sales
<br />Coordinator, Non -Collusion Affidavit
<br />was in order and a 10% Bid Bond
<br />was submitted.
<br />$ 3.25/ton
<br />$
<br />26,000.00
<br />$ 2.85/ton
<br />$
<br />14,250.00
<br />$ 2.25/ton
<br />$
<br />4,500.00
<br />TOTAL:
<br />$
<br />44,750.00
<br />Bid was signed by G.W. Clark, Vice
<br />President and Secretary -Treasurer,
<br />Non -Collusion Affidavit was in
<br />order and a Contractor's Bond for
<br />supplies in the amount of
<br />$70,000.00 was submitted.
<br />$150.00/ton
<br />.69/gal.
<br />.44/gal.
<br />.69/gal.
<br />.68/gal.
<br />.94/gal.
<br />TOTAL:
<br />$ 23,400.00
<br />$ 27,600.00
<br />$ 77,000.00
<br />$414,000.00
<br />$408,000.00
<br />$564,000.00
<br />$542,000.00
<br />1
<br />1
<br />1