My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Randolph Street Basin Emergency Repairs Proj No. 116-083D - JCI Bridge Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Quote Opening - Randolph Street Basin Emergency Repairs Proj No. 116-083D - JCI Bridge Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:44:28 PM
Creation date
10/26/2016 4:15:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Addendum 1 — Project No. 116-083D -ok ,,, y <br />QUOTE/PROPOSAL ` <br />CITY OF SOUTH BEND <br />1N49 , <br />PROJECT NAME Randolph Street Basin Emergency Repair <br />PROJECT NO. <br />QUOTES DUE October 20, 2016 —10:30 AM EST <br />Responding Firm Name: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and <br />LS <br />1 <br />$ <br />$ <br />Demobilization <br />13 - Go ©x <br />I 3 ocU o v <br />2 <br />Clearing Right -of -Way <br />LS <br />1 <br />$ f� <br />$ <br />3 <br />Concrete Spillway, Remove <br />LS <br />1 <br />$ <br />$ <br />4 <br />Fence Gate, Remove <br />LS <br />1 <br />$ <br />$ <br />5 <br />Fence, Remove <br />LFT <br />212 <br />$ tS� <br />$ 13 ? GG <br />i <br />6 <br />Stump, Grind <br />EACH <br />2 <br />$ <br />gjC_oc <br />$ <br />li�fsi..s�; <br />7 <br />Tree, Remove <br />EACH <br />2 <br />$ <br />$ <br />22vr..�o <br />Lf,y�u. ^.o <br />8 <br />Pavement Removal <br />SYS <br />34 <br />$ <br />$ <br />9 <br />Curb, Remove <br />LFT <br />80.0 <br />$ <br />$ <br />10 <br />Sidewalk, Remove <br />SFT <br />250.0 <br />$ <br />$ <br />11 <br />Excavation, Unclassified <br />LSUM <br />1 <br />$ <br />$ <br />12 <br />Borrow <br />CYS <br />494.0 <br />$ 01D <br />$ 5-4 LO-v <br />13 <br />Topsoil <br />CYS <br />214 <br />$ <br />$ <br />14 <br />Erosion Control Blanket <br />SFT <br />6,650 <br />$ . Z 1 <br />$ 6 s� <br />i <br />15 <br />High Performance Turf <br />SFT <br />6,704 <br />$ <br />$ <br />Reinforcement Mat (HPTRM) <br />_ <br />5 ,1 <br />:�7 Yam , <br />16 <br />Outlet Protection, Shoremax <br />SFT <br />180 <br />$ <br />$ <br />-70 <br />17 <br />Combination Curb & Gutter, <br />LFT <br />80.0 <br />$ <br />$ <br />Type B <br />LiU),u0 <br />3 ZOJ, ai> <br />18 <br />Header Curb, Special <br />LFT <br />52.0 <br />$ Lit �a <br />$ Z3LOo <br />/ <br />Version 7/28/2016 Contractor's Bid for Public Works - 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.