My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Randolph Street Basin Emergency Repairs Proj No. 116-083D - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Quote Opening - Randolph Street Basin Emergency Repairs Proj No. 116-083D - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:44:02 PM
Creation date
10/26/2016 4:11:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tiQ •5ov_rrr a`Ao <br />Addendum 1 —Project No. 116-083D <br />CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: Randolph Street Basin Emergency Repair <br />PROJECT NO. 116-083D <br />QUOTES DUE 043tigber 26, October 20, 2016 <br />(Must be completed for all quotes. Please type or print) <br />Date: 10/20/16 Firm: _HRP CONSTRUCTION INC. <br />Address: 5777 Cleveland Road, P.O. Box 266 <br />City/State/Zip: South Bend, IN 46624 Telephone Number: (574 ) 271 -7800 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Randolph Street Basin E <br />a <br />the City of South Bend, Indiana, in accordance with plans and specifications and Addendum 1 prepared by: <br />The City of South Bend, Department of Public Works <br />and dated October 3, 2016 1 for the sum of (enter the Total Quote as shown on the Proposal) <br />See Attached <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) <br />(Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />Addendum #1, 10/18/16 <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />By <br />(Signa <br />Matthew D. Cain, President <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />day of <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />200 <br />Version 9/1/2016 Page - 18 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.