My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Ireland Road Storm Repairs Proj No. 116-083G - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Quote Opening - Ireland Road Storm Repairs Proj No. 116-083G - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:42:26 PM
Creation date
10/26/2016 4:07:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
you rug . <br />CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: Ireland Road Storm Repairs <br />PROJECT NO. 116-083G <br />QUOTES DUE October 20, 2016 at 10:30 a.m. Local Time, with the intent to <br />award on October 25, 2016 <br />(Must be completed for all quotes. Please type or print) <br />Date: 10/20/16 Firm: HRP CONSTRUCTION INC. <br />Address: 5777 Cleveland Road, P.O. Box 266 <br />City/State/Zip: South Bend, IN 46624 Telephone Number: ( 574) 271-7800 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Ireland Road Storm Repairs <br />the City of South Bend, Indiana, in accordance with plans and specifications and Addendum Number 1 <br />prepared by: <br />The City of South Bend, Department of Public Works <br />and dated 1 0/1 2/1 6 1 for the sum of (enter the Total Quote as shown on the Proposal) <br />See Attached ($ ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. <br />Any addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as <br />that shown in the original contract if accepted by the City of South Bend. tk n s t e-awarded on <br />a unit basis, the itemization of the units shall be s a on a s rat a I nt. <br />By <br />(Signature <br />Addendum 1, 10/19/16 Matthew D. Cain, Presiden <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />I Z�7_1:3�Z�l;�lr11�C�15'l�]:1�9 <br />Gary A. Gilot, President <br />Eliabeth A. Maradik, Member <br />James A. Mueller, Member <br />ACCEPTANCE <br />day of <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Addendum No. 1 Page 12 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.