My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Chippewa Avenue Emergency Repairs Proj No. 116-083F - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Quote Opening - Chippewa Avenue Emergency Repairs Proj No. 116-083F - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:41:58 PM
Creation date
10/26/2016 4:06:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Chippewa Avenue Emergency Repairs <br />PROJECT NO. 116-083F <br />QUOTES DUE October 20, 2016 -10:30 a.m. <br />QUOTER'S NAME: Selge Construction Co., inc. <br />c�souraa a�, <br />4Q <br />2 <br />:J CJ <br />YAC'P <br />1865 <br />ItemNo. <br />Description <br />Quanti <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />I� 7tJ�r!3 <br />GC) <br />2 <br />Construction Engineering <br />1 <br />LS <br />/ CID-6 i <br />f 060-06 <br />3 <br />Clearing Right -of -Way <br />1 <br />LS <br />194 <br />4 <br />Present Structure, Remove <br />Portions <br />1 <br />LS <br />IT <br />�RaaD w�,�� <br />5 <br />Pavement Removal <br />90 <br />SYS <br />6 <br />Common Excavation <br />154 <br />CYS57/ <br />, 00 <br />7 <br />Dewatering <br />1 <br />LS <br />�, ox. f fC) <br />3 coo • 1r) <br />8 <br />Temporary Erosion and Sediment <br />Control <br />1 <br />LS <br />� 6i6G?,o1) <br />`lr/r 060- 66 <br />9 <br />Structure Backfill, Type 2 <br />130 <br />CYS <br />�� <br />� Uo <br />10 <br />Compacted Aggregate, No. 53 <br />Base <br />43 <br />TON <br />LF[f , -qo <br />0 1 <br />11 <br />HMA Patching, Type B <br />37 <br />TON <br />If 360 ,DQ <br />4'tit / Lj0 06 <br />12 <br />PCC Base Patching, 8 inch <br />90 <br />SYS <br />�(�3. <br />1�5,-7/ 5 •00 <br />13 <br />Milling, Asphalt Removal <br />90 <br />SYS <br />/U oC1 <br />�r <br />14 <br />CMA, Intermediate 11 <br />19 <br />TONc� <br />15 <br />D-1 Contraction Joint <br />40 <br />LIFT <br />�j N °O <br />tv0 <QC) <br />16 <br />Retrofit Tie Bars <br />12 <br />EACH <br />'OZ, 06 <br />f ce> <br />17 <br />Retrofit Load Transfer <br />36 <br />EACH <br />4,2t, <br />4 <br />18 <br />Riprap, Class 1 <br />112 <br />TONCl/ <br />19 <br />Riprap, Revetment <br />17 <br />TON <br />v <br />/ TT <br />20 <br />Geotextile <br />177 <br />SYS <br />/1 6, o <br />` ? 0 _ GY-) <br />21 <br />Sodding <br />65 <br />SYS <br />•23/, q() <br />0 a 1 06 <br />22 <br />Concrete, High Early <br />25 <br />CYS <br />1 00,06 <br />70 757.C�C) <br />23 <br />Concrete, Lean <br />28 <br />CYS <br />//0, �� <br />Y"3' 0 oU <br />Version 9/1/2016 Page - 20 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.